Approval of and authorization to award the lowest responsible bid to Cherokee Pride Construction Inc., and approve the execution of a construction contract for the Bristol Ponds Stormwater Improvements Project (SW25080)
End
Background:
This project is to mitigate erosion along a city owned drainage channel and along a private detention pond in Reserve H in the Bristol Ponds Subdivision. The project was advertised on August 26th, 2025 and September 2nd, 2025. Three (3) bids were received on September 16th, 2025. The lowest bidder was Cherokee Pride Construction Inc. for $86,786.00. The engineer’s estimate for the project was $154,861.50.
Cost: $86,786.00
Funding Source: 2018 General Obligation Bond
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: 20250917-BristolPondsCertifiedBidTab-SW25080
Recommendation:
recommend
Award the lowest responsible bid to Cherokee Pride Construction, Inc. and approve and authorize execution of a construction contract for the Bristol Ponds Stormwater Improvements Project (SW25080)