File #: 25-1332    Name:
Type: Consent Item Status: Agenda Ready
File created: 9/15/2025 In control: Broken Arrow City Council
On agenda: 10/7/2025 Final action:
Title: Approval of and authorization to award the lowest responsible bid to Cherokee Pride Construction Inc., and approve the execution of a construction contract for the Bristol Ponds Stormwater Improvements Project (SW25080)
Attachments: 1. 20250917-BristolPondsCertifiedBidTab-SW25080
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow City Council

Meeting of: 10-07-2025

 

Title:

title

Approval of and authorization to award the lowest responsible bid to Cherokee Pride Construction Inc., and approve the execution of a construction contract for the Bristol Ponds Stormwater Improvements Project (SW25080)

End

 

Background:

This project is to mitigate erosion along a city owned drainage channel and along a private detention pond in Reserve H in the Bristol Ponds Subdivision. The project was advertised on August 26th, 2025 and September 2nd, 2025. Three (3) bids were received on September 16th, 2025. The lowest bidder was Cherokee Pride Construction Inc. for $86,786.00. The engineer’s estimate for the project was $154,861.50.

 

Cost:                                                                $86,786.00

Funding Source:                     2018 General Obligation Bond

Requested By:                      Charlie Bright, P.E., Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          20250917-BristolPondsCertifiedBidTab-SW25080

 

Recommendation:

recommend

Award the lowest responsible bid to Cherokee Pride Construction, Inc. and approve and authorize execution of a construction contract for the Bristol Ponds Stormwater Improvements Project (SW25080)