File #: 24-611    Name:
Type: Consent Item Status: Agenda Ready
File created: 5/1/2024 In control: Broken Arrow City Council
On agenda: 5/7/2024 Final action:
Title: Acceptance of the Drainage Advisory Committee's recommendation to expend 2018 Go Bond, Proposition 6 funds for constructing a new storm sewer system along Dallas St between 2nd St and Haskell Park (Case No. 24-010)
Attachments: 1. 24-010 DALLAS ST PACKET
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Broken Arrow City Council
Meeting of: 05/07/24

Title:
title
Acceptance of the Drainage Advisory Committee's recommendation to expend 2018 Go Bond, Proposition 6 funds for constructing a new storm sewer system along Dallas St between 2nd St and Haskell Park (Case No. 24-010)
End

Background:
The storm sewer along the south side of East Dallas St between South 2nd St and South 4th St is corrugated metal pipe (CMP) and is estimated to have been installed between 1970 and 1990. Residents in the area have contacted the City about potential issues with the storm sewer in relation to holes forming around their driveways.
Staff investigated the site while it was raining. The holes were noted to be about in the same location as the storm sewer. The CMP was visible in one of the holes. Staff also sent a camera through the line. The video showed some separation of the pipe at the joints and areas water the bottom has rusted out.
This item was presented to the DAC in March 2023 Case 23-001 for design.
Further investigation after the design in April 2024 has revealed continued infrastructure deterioration. Staff is requesting $155,000.00 of unnamed Proposition 6 funds to construct the storm sewer line from South 2nd St to Haskell Park and repair adjacent properties.
This area flows to Haikey Creek.
On April 29, 2024, the Drainage Advisory Committee reviewed and recommended to City Council to approve the request for $155,000.00 in 2018 GO Bond Proposition 6 funds for the construction of a storm sewer system along Dallas St from 2nd to Haskell Park.


Cost: $155,000.00
Funding Source: 2018 GO Bond, Proposition 6
Requested By: Charlie Bright, Director of Engineering and Construction
Approved By: City Manager's Office
Attachments: Drainage Report, Exhibits


Recommendation:
recommend
Accept the Drainage Advisory Committees' recommendation to expend 2018 GO Bond Proposition 6 funds for constructing a new storm sewer system ...

Click here for full text