Approval of and authorization to execute a Professional Consultant Agreement with Holloway, Updike and Bellen, Inc. for Wastewater Collection System Rehabilitation - Lynn Lane WWTP Subbasin LL30 and LL33 (Project No.S.24040)
End
Background:
This project consists of performing Infiltration and Inflow (I&I) reduction field investigations and prepare defects summary reports and rehabilitation recommendations for the future rehabilitation of Wastewater Collection System Lynn Lane WWTP Subbasins LL30 and LL33. Due to excess I&I and issues with the wastewater system in this area it has been determined that a comprehensive study should be completed to identify the issues and make a rehabilitation plan to help alleviate the issues. The work includes, but is not limited to, Manhole inspections, Manhole dye testing, Smoke testing, CCTV Inspection, Defects analysis and report, Data compiled into a field investigation report as well as a Rehabilitation Recommendation report.
A Professional Consultant Agreement with Holloway, Updike and Bellen, Inc. has been negotiated for $549,799.27 to include Infiltration and Inflow (I&I) reduction field investigations and prepare defects summary reports and rehabilitation recommendations for the future rehabilitation of Wastewater Collection System Lynn Lane WWTP Subbasins LL30 and LL33.
|
Cost: |
$549,799.27 |
|
Funding Source: |
OWRB Loan |
|
Requested By: |
Charlie Bright, P.E., Director of Engineering & Construction |
|
Approved By: |
City Manager’s Office |
|
Attachments: |
Professional Consultant Agreement |
Recommendation:
recommend
Approve and authorize execution of a Professional Consultant Agreement with Holloway, Updike and Bellen, Inc. for Wastewater Collection System Rehabilitation - Lynn Lane WWTP Subbasin LL30 and LL33 (Project No.S.24040)