Background:
For the 79th Street (Midway Road) and Houston Street Intersection, it was determined that multiple Wagoner County Rural Water District #4 water lines are in close proximity to the proposed new roadway footprint. One of the lines is a 30” raw water line that feeds the Oneta Power Plant. To gather more detailed depth information on these lines and ensure adverse impacts to these lines are avoided, Subsurface Utility Engineering Level A services are being added into the design contract.
Cost: $6,800
Funding Source: 2018 GO Bond Proposition 1
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: 20260908-Amendment#1-Midway-and-Houston-ST24240
Recommendation:
recommend
Approve and authorize execution of Amendment #1 to Agreement for Professional Consultant Services with Kimley-Horn and Associates, Inc. for the 79th Street (Midway Road) and Houston Street Intersection Widening project (Project #ST24240)