Skip to main content
LEGISLATIVE RESEARCH CENTER
File #: 24-535    Name:
Type: Consent Item Status: Agenda Ready
File created: 4/19/2024 In control: Broken Arrow City Council
On agenda: 6/17/2024 Final action:
Title: Approval of and authorization to execute the award of the lowest responsible bid to Envision Civil Contractors, LLC and approve the execution of a construction contract for the Preserve Park Pond North Path and Slope Repair project (SW24060)
Attachments: 1. Preserve Park Pond North Path and Slope Repair Bid Tab
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow City Council

Meeting of:  6-17-2024

 

Title:

title

Approval of and authorization to execute the award of the lowest responsible bid to Envision Civil Contractors, LLC and approve the execution of a construction contract for the Preserve Park Pond North Path and Slope Repair project (SW24060)

End

 

Background:

This project is to repair the north path at the preserve Park Pond, create an interceptor ditch to drain water to the proper points, install stormwater pipes and basins, and grade the slope to the pond to correct gulleys that have formed. This project is located at Preserve Park Pond along 37th Street. The path is along the north shore of the pond.

The project was advertised on May 14, 2024 and May 21, 2024. Four (4) bids were received on June 4, 2024. The lowest responsible bid was Envision Civil Contractors, LLC for $125,623.75. The engineers estimate for the project was $226,032.73.

 

 

Cost:                                                                $125,623.75

Funding Source:                     2018 G.O. Bond Proposition 6

Requested By:                      Charlie Bright, Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          Certified Bid Tabulation 

 

Recommendation:

recommend

Award the lowest responsible bid to Envision Civil Contractors, LLC and approve and authorize execution of a construction contract for the Preserve Park Pond North Path and Slope Repair (SW24060)

end