Broken Arrow Municipal Authority
Meeting of: 03-03-2026
Title:
title
Approval of and authorization to execute Amendment No. 1 to the Professional Consultant Agreement with Holloway, Updike, and Bellen, Inc. for the Willow Springs Lift Station Relief Line (Project No. 2154300)
End
Background:
The project consists of the demolition of the existing Willow Springs Lift Station that is in poor condition and the design of approximately 1,450 linear feet of a new gravity sanitary sewer relief line. The proposed gravity flow system will connect to an existing gravity line located near the existing lift station.
It was determined that additional work was needed to complete this project. The additional work includes performing a Cultural/Archaeological Survey which is required in order to meet funding requirements with the Oklahoma Water Resources Board (OWRB). Amendment No. 1 has been negotiated with Holloway, Updike, and Bellen, Inc. to facilitate this additional survey for $3,500.00.
Cost: $3,500.00
Funding Source: OWRB Loan
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: 2154300 - Willow Springs Lift Station Relief Line Amendment No. 1
Recommendation:
recommend
Approve and authorize execution of Amendment No. 1 to the Professional Consultant Agreement with Holloway, Updike, and Bellen, Inc. for the Willow Springs Lift Station Relief Line (Project No. 2154300)