From: Engineering and Construction Department
Title:
title
Approval of and authorization to execute Amendment No. 2 to Professional Consultant Agreement with Holloway, Updike, and Bellen, Inc. for Revising the Design of Albany Street Improvements from 9th Street to 23rd Street (Project No. SW1709)
End
Background:
This Amendment No. 2 is to update the design of the Albany Street Improvements project from 9th Street to 23rd Street, to incorporate recent construction in the vicinity of the roadway and stormwater improvements that were conceptually designed in-house by the Engineering and Construction Department in an effort to reduce construction costs. Engineering and Construction Department staff have negotiated a fee of $8,940.00 with Holloway, Updike, and Bellen, Inc. to complete and finalize the design and incorporate the stormwater improvements into a set of contract documents.
Funding for this amendment is available in the 2014 Stormwater GO Bond.
Cost: $ 8,940.00 Amendment No. 2
$110,000.00 Amendment No. 1
$243,600.00 Original Agreement
$362,540.00 Total
Prepared By: Alex M. Mills, P.E., Engineering and Construction Director
Reviewed By: Engineering and Construction Department
Finance Department
Assistant City Manager - Operations
Approved By: Michael L. Spurgeon, City Manager
Attachments: Amendment No. 2 to Professional Consultant Agreement
Recommendation:
Approve and authorize execution of Amendment No. 2 to Professional Consultant Agreement with Holloway, Updike, and Bellen, Inc. for updating/revising the design of Albany Street Improvements from 9th Street to 23rd Street.