Broken Arrow City Council
Meeting of: 08-19-2025
Title:
title
Acceptance of the Drainage Advisory Committee’s recommendation to approve expenditure of 2018 General Obligation (GO) Bond funds to design drainage improvements in the Silvertree subdivision
End
Background:
The case was brought before the Drainage Advisory Committee on July 28th, 2025 for design funds. The Committee voted 6-0 to recommend approval of expenditure of funds.
The project is located in the Silvertree Subdivision, west of New Orleans Square. Offsite flow from an undeveloped tract flows through multiple properties eventually reaching the applicant’s property. The runoff has cause erosion in her yard and around her fence posts and mud is washing from under the fence into her neighbor’s property. When it stops raining, the applicant states water continues to flow through her property like a small stream for a long period of time.
Approximately 18 acres of undeveloped offsite flow flows to the applicant’s property. PSO owns an empty lot adjacent to the unplatted land. There are transmission lines that are on the PSO property as well.
Staff is requesting $50,000.00 of the 2018 General Obligation Bond Proposition 6 for funds to design drainage improvements to capture the stormwater and convey it to the storm sewer system along W Quantico PL.
This area flows to Aspen Creek.
Cost: $50,000.00
Funding Source: 2018 General Obligation Bond, Proposition 6
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: Drainage Report, Exhibits
Recommendation:
recommend
Accept the Drainage Advisory Committee’s recommendation to approve expenditure of 2018 General Obligation funds for design for drainage improvements in the Silvertree subdivision
end