Broken Arrow Drainage Advisory Committee
Meeting of: 11-3-2025
Title:
title
Consideration, discussion and possible action to recommend to Council to expend funds for drainage design improvements to a drainage channel located in the 6100 Center commercial subdivision (Case No. 25-020)
End
Background:
The proposed project is to design drainage improvements to an existing concrete lined channel on private property in the 6100 Center Commercial subdivision located between 1804 N. Willow Ave. and 1901 N. Willow Ave.
The existing channel was constructed in 1985 using spray cement. The water is flowing under the concrete channel, as the bottom of the channel has failed and the sidewalls have washed out. The property management company has attempted temporary repairs but proven insufficient. The deterioration of the channel poses potential risks and adverse impacts to surrounding property owners. There is an existing sanitary sewer line that runs parallel to the drainage channel as well that could be at potential risk from the eroding channel.
This is in the Haikey Creek Watershed.
Staff is requesting $50,000.00 of the 2018 General Obligation Bond Proposition 6 funds to design drainage improvements to the existing concrete lined drainage channel.
Cost: $50,000.00
Funding Source: 2018 General Obligation Bond, Proposition 6
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: Drainage Report, Exhibits
Recommendation:
recommend
Recommend to Council the expenditure of funds for drainage design improvements to a drainage channel located in the 6100 Center commercial subdivision (Case No. 25-020)
end