Background:
Fire Station #5 generator can no longer sustain energy needs the station during a power outage. This project will replace the generator, and all required electrical connections.
City Staff negotiated an agreement with EDA + FKI. to design and prepare Construction Documents for $14,000.00.
Cost: $14,000.00
Funding Source: STCI
Requested By: Charlie Bright, PE Director of Engineering and Construction
Approved By: City Manager’s Office