Legislation Details

File #: 26-811    Name:
Type: Presentations Status: Agenda Ready
File created: 5/29/2026 In control: Broken Arrow City Council
On agenda: 6/1/2026 Final action:
Title: Presentation regarding road closure at Aspen and Jasper on the west side of the intersection.
Attachments: 1. Paragon Jasper Road Closure TCP Revision 1
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow City Council

Meeting of: 06-01-2026

 

Title:

title

Presentation regarding road closure at Aspen and Jasper on the west side of the intersection.

End

Background:

Paragon contractors have entered into an agreement with the City of Broken Arrow to widen the intersection at Aspen and Jasper. During construction the storm sewer for the widening along the north side of Jasper to the west of the intersection, the roadway sluffed due to poor soils. The contractor had shoring along that section, but the soils and moisture caused damage to Jasper that needs to be repaired. This repair can be done in 3 weeks along with other work to the intersection that would be safer to do when Jasper is closed at the bridge. In the attached traffic control plan attached, the road will be closed at the bridge on Jasper on the west side of the Aspen intersection. Traffic would be routed around the mile section headed east from Olive. Traffic headed west along Jasper will be allowed to turn north or south.

 

 

Cost:                                                                $0

Funding Source:                     N/A

Requested By:                      Charlie Bright, PE, Director of Engineering and Construction                                    

Approved By:                      City Manager’s Office

Attachments:                                          Aspen and Jasper Traffic Control Plan

                         

Recommendation:

recommend

No Action Required

end