File #: 25-1515    Name:
Type: Consent Item Status: Agenda Ready
File created: 10/20/2025 In control: Broken Arrow Municipal Authority
On agenda: 11/4/2025 Final action:
Title: Approval of and authorization to execute Change Order #1 with Belt Construction, Inc for the County Line Trunk Sewer Phase 2A (2154520)
Attachments: 1. COR_01_-_Conflict_with_Existing_Utility_MH_at_144+11
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Municipal Authority

Meeting of:  11-04-2025

 

Title:

title

Approval of and authorization to execute Change Order #1 with Belt Construction, Inc for the County Line Trunk Sewer Phase 2A (2154520)

End

 

Background:

County Line Trunk Sewer Phase 2A project is to improve the trunk sewer line along County Line Road (23rd Street). This project replaces an old line and allows for better flows to the Waste Water Treatment Plant. 

Change Order #1 addresses the following additions/deletions/changes to the contract:

-                     Shift 66” cast iron to the North 20 ft, add 10ft to the bore under New Orleans St and remove 10 ft from bore under County Line Rd.

-                     Add 4 ft Diameter Manhole and install 12” PVC sewer main

-                     Modify Fiberglass Manhole

-                     No change in contract time

 The total cost for Change Order #1 amounts to $50,000.00

The additional cost associated with these changes is as follows:

Previous Change Orders:                                          $0.00

This Change Order(s):                                                               $50,000.00

Total Cost of Change Orders:                                          $50,000.00

Original Contract Amount:                                          $5,852,572.00

Revised Contract Amount:                                          $5,902,572.00

 

Percent Change in Contract:                                          0.85%

Applicable to Comp. Bid Act:                     0.29%

Cost:                                                                $50,000.00

Funding Source:                     OWRB Loan

Requested By:                      Charlie Bright, PE, Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          COR_01- Conflict with Existing Utility MH at 144+11

Recommendation:

recommend

Approve and authorize the execution of Change Order #1 Belt Construction, Inc for the County Line Trunk Sewer Phase 2A (2154520).

end