Broken Arrow City Council
Meeting of: 1-2-2024
Title:
title
Approval of and authorization to execute Amendment Number 2 to Professional Consultant Agreement with MKEC Engineering, Inc. for the 37th Street Improvements From Houston Street to Albany Street (Project Number ST1413)
End
Background:
In order to make necessary revisions requested by Engineering & Construction Department staff for purposes of bidding the 37th Street widening improvements for the north mile of this project, from Kenosha to Albany, staff negotiated a design amendment with MKEC Engineering, Inc., the consulting firm responsible for design. The revisions include the following: modification of grading, riprap, and concrete slope lining at two drainage structures to improve stream bed and bank stability and comply with United States Army Corps of Engineers (USACE) requirements for permitting, modification of downstream channel grading limits to reflect current ground topography at on drainage structure, modification of backslope grading in two locations to avoid utility conflict with existing force main sanitary sewer, submission of USACE permitting application for two blue line stream crossings, and miscellaneous updates to address changed field conditions that have occurred during the design process.
Staff recommends approval of this design amendment.
Cost: $39,920
Funding Source: 2011 GO Bond (Fund 591)
Requested By: Kenneth D. Schwab, Interim Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: Amendment Number 2
Recommendation:
recommend
Approve and authorize execution of Amendment Number 2 to Professional Consultant Agreement with MKEC Engineering, Inc. for the 37th Street Improvements From Houston Street To Albany Street (Project No. ST1413)
end