Legislation Details

File #: 26-1826    Name:
Type: Consent Item Status: Agenda Ready
File created: 11/16/2026 In control: Planning Commission
On agenda: 11/19/2026 Final action:
Title: Approval of PR-000885-2025| PT-003215-2026, Conditional Final Plat for Walmart Addition, approximately 16.875 acres, 2 Lots, Commercial General (CG), located on the northwest corner of E. Kenosha Street (71st Street) and Oneta Road (S. 241st East Avenue)
Attachments: 1. Conditional Final Plat of Walmart Addition with staff comments, 2. Walmart Plat Comments from City ROW Agent
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Broken Arrow Planning Commission
11-19-2026

To: Chairman and Commission Members
From: Community Development Department
Title:
title
Approval of PR-000885-2025| PT-003215-2026, Conditional Final Plat for Walmart Addition, approximately 16.875 acres, 2 Lots, Commercial General (CG), located on the northwest corner of E. Kenosha Street (71st Street) and Oneta Road (S. 241st East Avenue)
End
Background:
Applicant: Kimley-Horn
Owner: Oneta71, LLC
Developer: Oneta71, LLC
Engineer: Kimley-Horn
Location: Northwest corner of E. Kenosha Street (71st Street) and Oneta Road (South 241st East Avenue)
Size of Tract 16.875 acres
Number of Lots:|910|Present Zoning: Commercial General (CG)
Proposed Zoning: Commercial General (CG)
Comp Plan: Level 4 (Commercial/Employment Nodes) & Greenway/Floodplain

PT-003215-2026, the Conditional Final Plat for Walmart Addition, contains two lots on 16.875 acres. This property is located on the northwest corner of E. Kenosha Street (71st Street) and Oneta Road (S. 241st East Avenue
Access to this development will be provided on E. Kenosha Street (71st Street) and Oneta Road (S. 241st East Avenue). Statutory right-of-way was previously dedicated including 24.75 feet and an additional 25.25 feet for a total of 50 feet of right-of-way on Oneta Road. Additionally, only 50 feet of right-of-way has been dedicated along Kenosha Street. As primary arterial streets, 60 feet of right-of-way is needed along both street frontages as well as the additional width required at arterial intersections and the corner clip. These and other comments will need to be addressed on the final plat.
 
According to FEMA maps, a small portion of the northwest corner of the plat falls within the 100-year floodplain. No development is proposed within the floodplain area.
 
Water and sanitary sewer is serviced by the City of Broken Arrow. The Conditional Final Plat was reviewed by the Technical Advisory Committee on November 10, 2026. The applicant is in agreement...

Click here for full text