Title: Consideration, discussion, and possible approval of and authorization to award to the lowest responsible bidder, Diversified Civil Contractors, LLC, a construction contract for Aspen Avenue and Tucson Street Intersection Improvements (Project No. ST2031 - Phase 4)
Attachments: 1. ST2031 Bid Tab 010726

Broken Arrow City Council

Meeting of: 1-20-2026

 

Title:

title

Consideration, discussion, and possible approval of and authorization to award to the lowest responsible bidder, Diversified Civil Contractors, LLC, a construction contract for Aspen Avenue and Tucson Street Intersection Improvements (Project No. ST2031 - Phase 4)

End

 

Background:

The project was designed by CEC for construction including rehabilitation and widening of the existing paving to five (5) lanes on Aspen Avenue south of Tucson Street and four (4) lanes on Tucson Street west of Aspen Avenue at the intersection.  The project includes 9” of portland cement concrete widening adjoining the existing concrete pavement on either side.  The project also includes construction of sidewalk, ADA curb ramps at intersections, concrete work at driveway returns, and new pedestrian signals, signage, striping and pavement markings at the Aspen Avenue and Tucson Street intersection.

The project was advertised on December 2nd, 2025.  Bids were opened on January 6th, 2026 with four (4) bids received and all being responsive. The Certified Bid Tabulation is attached. The bids submitted were composed of fifty-seven (57) pay items to form the Total Base Bid. The lowest responsible bidder was Diversified Civil Contractors, LLC, with a Total Bid of $517,535.50. The engineer’s estimate for widening and improvement of this arterial intersection was $544,622.50.

 

Cost:                                                                $517,535.50

Funding Source:                     2018 GO Bond - Proposition 1

Requested By:                      Charlie Bright, Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          Certified Bid Tabulation

Recommendation:

recommend

Approve and authorize award to the lowest responsible bidder, Diversified Civil Contractors, LLC, for a construction contract for Aspen Avenue and Tucson Street Intersection Improvements (Project No. ST2031 - Phase 4)