Broken Arrow Municipal Authority
Meeting of: 09-03-2024
Title:
title
Consideration, discussion, and possible approval of and authorization to execute a long-term strategic plan for Adams Creek Sewershed Basin
End
Background:
The Adams Creek Sewer Subbasin located in northeast Broken Arrow is owned and maintained by the Broken Arrow Municipal Authority, all the sanitary sewer flows from this subbasin currently flow to the Lynn Lane Wastewater Treatment Plant (LLWWTP). This area of the system naturally flows in the opposite direction from the plant so multiple lift stations are required to pump this flow against gravity to LLWWTP. Pumping this amount of wastewater requires multiple lift stations which require significant maintenance and often cause sewer lines/manholes to degrade more quickly. Due to these concerns as well as growth seen in this area, a feasibility study was conducted that evaluated the possibility of building a new wastewater plant in the Adams Creek Basin. This study evaluated several different options for flow transfers to a possible new plant as well as continuing on the current path of sending everything to LLWWTP for what the best path forward would be for BAMA’s system
Cost: $0
Funding Source: N/A
Requested By: Charlie Bright, P.E., Director of Engineering & Construction
Approved By: City Manager’s Office
Attachments: Adams Creek Wastewater System Feasibility Study Presentation
Recommendation:
recommend
Approve and authorize execution of a long term plan for Adams Creek Sewershed Basin
end