Broken Arrow City Council
Meeting of: 05-06-2025
Title:
title
Presentation of conceptual design options for the Dallas Street Improvements from Main Street to 9th Street (Project Number ST25320)
End
Background:
On March 4th, 2025, Engineering & Construction Department staff received approval from City Council to begin design of the 2018 GO Bond Proposition 1 project Dallas Street Improvements from Main Street to 9th Street (ST25320). Staff gave notice to proceed to Kimley-Horn and Associates, Inc. to develop plans and cost estimates for three conceptual design options described as follows:
Option 1 - pavement mill/patch/overlay with no drainage improvements.
Option 2 - pavement mill/patch/overlay with drainage improvements utilizing curb/gutter and paved flumes.
Option 3 - pavement mill/patch/overlay, widening to 3-lanes with curb/gutter, and enclosed storm sewer drainage improvements.
Sidewalk improvements, along the north side of Dallas only, were also included in all three options.
The consultant has submitted the conceptual design plans, with cost estimates, for all three options and these documents are included here for City Council’s review and comment.
It should be noted the area in question was originally planned and developed decades prior to current design standards governing minimum drainage and roadway requirements. Due to the costs and associated benefits of all three options, staff recommends constructing Option 1 including sidewalk improvements along the north side of Dallas Street only.
Cost: TBD
Funding Source: 2018 GO Bond Proposition 1
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: Conceptual Design Plans and Cost Estimates for three options
Recommendation:
recommend
No action is required.
end