Title: Award the lowest responsible bid to Air Comfort Solutions, and approve and authorize execution of a construction contract for Streets and Stormwater Building HVAC (Project No. 185322)
Attachments: 1. 180327 Certified Bid Tab 185322

Broken Arrow City Council

                                                                                               Meeting of: 04-03-18

                                                               

To:                     Mayor and City Council

From:                     Engineering and Construction Department

Title: 

title

                     Award the lowest responsible bid to Air Comfort Solutions, and approve and authorize execution of a construction contract for Streets and Stormwater Building HVAC (Project No. 185322)

End

Background:

The Streets and Stormwater Building is located at 2302 S. 1st Place.  New roof top HVAC units have been designed and bid documents were released.  The project was advertised for bids on March 5 and 12, 2018.  Bids were opened on March 27, 2018 and five (5) bids were received.  The low bidder was Air Comfort Solutions with a bid of $42,563.00 for the Base Bid and the engineer’s estimate was $54,050.00.  The certified bid tabulation is attached.  Staff recommends award of the Base Bid for the Streets and Stormwater Building HVAC to Air Comfort Solutions, in the amount of $42,563.00.

 

Funds for the work are available in the Sales Tax Capital Improvement Fund 30.

 

Cost:                                                                $42,563.00

Prepared By:                                           Alex M. Mills, P.E., CFM, Engineering and Construction Director

Reviewed By:                                          General Services
                                    Streets and Stormwater
                                    Finance Department
                                    City Attorney
                                    Assistant City Manager - Operations

 

Approved By:                      Michael L. Spurgeon, City Manager
                                  

Attachments:                                          Certified Bid Tabulation

Recommendation:

Award the lowest responsible bid to Air Comfort Solutions, and approve and authorize execution of a construction contract for Streets and Stormwater Building HVAC.