Title:
title
Consideration, discussion, and possible approval of award of the lowest responsible bid to Muscat Co. and authorize execution of a construction contract for Paint Existing Traffic Signals (Project Number 2453180)
End
Background:
The Engineering and Construction Department has bid the Paint Existing Traffic Signals Project, which includes thirty-nine signal locations throughout the City of Broken Arrow.
The project was advertised for bids on November 5, 2024 and November 12, 2024 according to the Competitive Bid Act and bids were opened on November 26, 2024, with three (3) bids being received. The Certified Bid Tabulation is attached. The bids submitted were composed of three (3) pay items.
The lowest responsible combined bid was submitted by Muscat Co. for $374,250.00.
Cost: $374,250.00
Funding Source: Fund 342 - Street Light Fund
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: Certified Bid Tabulation
Recommendation:
recommend
Award the lowest responsible base bid to Muscat Co. and approve and authorize execution of a construction contract for Paint Existing Traffic Signals (2453180).