Title: Authorization to close project SW24050 Glen Eagles V and return the $7,502.00 of the 2018 General Obligation Bond funds to the appropriate basin. Original Agenda Item Number 23-1507
Attachments: 1. SW24050 Glen Eagle V Closeout Signed
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Drainage Advisory Committee

Meeting of: 07-27-26

 

Title:

title

Authorization to close project SW24050 Glen Eagles V and return the $7,502.00 of the 2018 General Obligation Bond funds to the appropriate basin. Original Agenda Item Number 23-1507

End

 

Background:

The project SW24050 Glen Eagles V was to perform a survey to aid in the possible design of mitigation of nuisance water.

Council approved $15,000.00 of funds for a survey on 01-16-24. The City of Broken Arrow contracted with a surveying company to perform the survey for $7,498.00.

The survey found the drainage path surveyed contained multiple utilities and a shallow rock ledge that would complicate any alteration of the flow path. Due to higher than anticipated costs, and the limited scale of public benefit design of the project was not recommended to move forward.

This is in the Spunky Creek Basin

   

 

Cost:                                                                $0.00

Funding Source:                     2018 GO Bond, Proposition 6

Requested By:                      Charlie Bright, P.E., Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          Project Close Out Form 

 

Recommendation:

recommend

Authorize the closing of the project SW24050 Glen Eagles V and return the $7,502.00 of the 2018 General Obligation Bond funds to the appropriate Basin. Original Agenda Item number 23-1507

end