Broken Arrow Drainage Advisory Committee
Meeting of: 11-16-26
Title:
title
Acceptance of the Drainage Advisory Committee’s recommendation to close project SW2006 Covington Creek Bank Stabilization and return the $2,253.00 of the 2018 General Obligation Bond funds to the appropriate basin
End
Background:
The project SW2006 Covington Creek Bank Stabilization was for assistance with bank stabilization due to erosion of an unnamed tributary to Covington Creek around Deer Creek
Council approved $50,000.00 of funds to assist with the stabilization
Staff contracted with an engineering firm to do a study of the creek and provide construction documents. This contract was for $47,747.00
The remaining balance of $2,253.00 is to be transferred back into the corresponding basin fund
This is in the Adams Creek Basin
Cost: $0.00
Funding Source: 2018 GO Bond, Proposition 6
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: 20261016 SW2006 Covington Creek Closeout
Recommendation:
recommend
Accept the Drainage Advisory Committee Recommendation to close the project SW2006 Covington Creek Bank Stabilization and return the $2,253.00 of the 2018 General Obligation Bond funds to the appropriate Basin