File #: 26-615    Name:
Type: Consent Item Status: Agenda Ready
File created: 4/28/2026 In control: Broken Arrow City Council
On agenda: 5/5/2026 Final action:
Title: Approval of and authorization to execute Change Order #1 with Wyatt Contracting. Inc (SW1910)
Attachments: 1. Stoneridge_Towne_Center_Change_Order_1
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow City Council

Meeting of:  05-05-2026

 

Title:

title

Approval of and authorization to execute Change Order #1 with Wyatt Contracting. Inc (SW1910)

End

 

Background:

The Stoneridge and Elm Drainage Improvements project completed a detention pond with an outlet structure.  

Change Order #1 addresses the following additions/deletions/changes to the contract:

-                     Delete 196 LF of Temporary Silt Fence, delete 2 sediment filters, delete 720 LF of ditch liner protection, delete 1 stabilized construction entrance, delete 119 CY of 10’ wide gravel access road, delete 1 low water crossing, and delete 3 rock check dams.

Total time added to contract is:

-                     Time was added in a work change directive due to sodding.

 

 The total cost for Change Order #1 amounts to ($31,416.80)

The additional cost associated with these changes is as follows:

Previous Change Orders:                                          $0

This Change Order(s):                                                               ($31,416.80)

Total Cost of Change Orders:                                          ($31,416.80)

Original Contract Amount:                                          $375,449.50

Revised Contract Amount:                                          $344,03.70

 

Percent Change in Contract:                                          -8.37%

Applicable to Comp. Bid Act:                     0%

Cost:                                                                ($31,416.80)

Funding Source:                     2018 GO Bond

Requested By:                      Charlie Bright, PE, Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          Stoneridge Towne Center Change Order 1
 

Recommendation:

recommend

Approval of and authorization to execute Change Order #1 with Wyatt Contracting, INC for the Stoneridge and Elm Drainage Improvements (SW1910)

end