LEGISLATIVE RESEARCH CENTER
File #: 15-832    Name:
Type: Consent Item Status: Passed
File created: 12/30/2015 In control: Planning Commission
On agenda: 1/14/2016 Final action: 1/14/2016
Title: Consideration and possible action regarding PT15-116, Conditional Final Plat, Collision Works, 2 lots, 2.64 acres, CH to PUD 243/CH and IL, southeast corner of Kenosha Street and 14th Street , south of Kenosha Street, one-third mile east of 9th Street
Attachments: 1. 2-CHECKLIST.COLLISION WORKS.pdf, 2. 3-CONDITIONAL FINAL PLAT.COLLISION WORKS.pdf, 3. 4-CONCEPTUAL SITE PLAN.COLLISION WORKS.pdf
Related files: 15-727
Broken Arrow Planning Commission
01-14-2016

To: Chairman and Commission Members
From: Development Services Department
Title:
title
Consideration and possible action regarding PT15-116, Conditional Final Plat, Collision Works, 2 lots, 2.64 acres, CH to PUD 243/CH and IL, southeast corner of Kenosha Street and 14th Street , south of Kenosha Street, one-third mile east of 9th Street
End
Background:
Applicant: Malek Elkhoury, Khoury Engineering, Inc.
Owner: Collision Works Properties, LLC
Developer: Collision Works
Engineer: Khoury Engineering, Inc.
Location: Southeast corner of Kenosha Street and 14th Street, south of Kenosha Street, one-third mile east of 9th Street
Size of Tract 2.64 acres
Number of Lots:|913|
Present Zoning: CH
Proposed Zoning: PUD 243/CH and IL
Comp Plan: Level 6

PT15-116 is the conditional final plat of, Collision Works, a replat of "Steele-Morrel Center" and contains 2.64 acres, located on the southeast corner of Kenosha Street and 14th Street, south of Kenosha Street, one-third mile east of 9th Street. Part of the property has been previously platted as "Steele-Morrel Center" and part has been platted as "Blocks 1, 2, & 3 Arrow Village Addition." According to the applicant, there is a small area between these two plats that is unplatted. With the Collision Works plat, applicant is replatting the entire property into one new plat with two lots. Some of the existing easements within the Collision Works plat will be vacated by separate instrument.

The property associated with this plat is presently zoned CH. On December 1, 2015, the City Council approved BAZ 1946, a request to change the zoning on Lot 1, Block 2 to IL (Industrial Light). The underlying zoning on Lot 1, Block 1 will remain CH. In conjunction with BAZ 1946, PUD 243 was also approved over the entire property, subject to the property being re-platted. The preliminary plat was approved by the Planning Commission on December ...

Click here for full text