Broken Arrow Municipal Authority
Meeting of: 12-2-2025
Title:
title
Consideration, discussion, and possible approval of the lowest responsible bid to Crossland Heavy Contractor’s, Inc. and authorize execution of a construction contract for the Verdigris River Water Treatment Plant On-Site Hypochlorite Generation System Brine Tank (Project No. 2154350)
End
Background:
The Verdigris River Water Treatment Plant currently has one Brine Tank. To prepare for future growth in the City of Broken Arrow and to help with redundancy and peak flow one additional Brine Tank will be added. This project is for the construction of one additional Brine Tank to the existing Verdigris River Water Treatment Plant and includes the associated site/civil, structural, electrical, and instrumentation and control improvements to support the proposed facility. HDR Engineering, Inc. designed these improvements. Construction time will be 365 calendar days.
This project was advertised on October 23rd and October 30th, 2025. An optional Pre-Bid Meeting was held virtually on November 4th, 2025, and an optional Site Visit Meeting was held on November 4th, 2025. There were two (2) bids received on November 13th, 2025. The Certified Bid Tabulation is attached. The lowest responsible bid was Crossland Heavy Contractor’s, Inc. for a Base Bid of $1,092,000.00.
Cost: $1,092,000.00
Funding Source: OWRB Loan
Requested By: Charlie Bright, P.E., Director of Engineering & Construction
Approved By: City Manager’s Office
Attachments: Certified Bid Tabulation-VRWTP Brine Tank.Signed-2154350
Recommendation:
recommend
Award the lowest responsible bid to Crossland Heavy Contractor’s, Inc. and approve and authorize execution of a construction contract for the Verdigris River Water Treatment Plant On-Site Hypochlorite Generation System Brine Tank (Project No. 2154350)
end