File #: 23-1566    Name:
Type: Consent Item Status: Agenda Ready
File created: 12/4/2023 In control: Planning Commission
On agenda: 12/7/2023 Final action:
Title: Approval of LOT-001173-2023 (Lot Consolidation), Gatesway 8-Plex, 1 Proposed Lot, 24.58 acres, A-1 (Agricultural) and RD (Residential Duplex)/PUD-176, located approximately one-quarter mile north of Houston Street (81st Street) and one-half mile east of 9th Street (Lynn Lane)
Attachments: 1. 2-Case Map.LOT-001173-2023, 2. 3-Aerial.LOT-001173-2023(a), 3. 4-Lot Combination Exhibit, 4. 5-Gatesway Foundation Campus
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Broken Arrow Planning Commission
12-07-2023

To: Chairman and Commission Members
From: Community Development Department
Title:
title
Approval of LOT-001173-2023 (Lot Consolidation), Gatesway 8-Plex, 1 Proposed Lot, 24.58 acres, A-1 (Agricultural) and RD (Residential Duplex)/PUD-176, located approximately one-quarter mile north of Houston Street (81st Street) and one-half mile east of 9th Street (Lynn Lane)
End

Background:
Applicant: Route 66 Engineering
Owner: Gatesway Foundation
Developer: Gatesway Foundation
Surveyor: White Surveying Company
Location: One-quarter mile north of Houston Street (81st Street) and one-half mile east of 9th Street (Lynn Lane)
Size of Tract 24.58 acres
Number of Lots: 2 existing, 1 proposed
Zoning: A-1 (Agricultural) and RD (Residential Duplex)/PUD-176
Comp Plan: Levels 3 and 6

Lot consolidation request LOT-001173-2023 involves 24.58 acres that is proposed to be consolidated into a single lot. The property, which is located approximately one-quarter mile north of Houston Street (81st Street) and one-half mile east of 9th Street (Lynn Lane) and has been platted as Lots 1 and 5, Block 1, Gatesway Foundation Campus.

The applicant is proposing to consolidate these lots to construct two 4-plex units on the site. The proposed used of the property is in conformance with PUD-176 approved on the property on July 2, 2007. The property was platted in Tulsa County on December 21, 2011.

According to the FEMA Maps, none of the property designated as floodplain. Water and sanitary sewer are available from the City of Broken Arrow. This lot consolidation is not in conflict with any provisions of the zoning ordinance.

Oklahoma Natural Gas (ONG), Public Service Company of Oklahoma (PSO), Windstream, and Cox Communications have indicated that they do not have any problems with the proposed lot split.