File created: 2/10/2025 In control: Broken Arrow City Council
On agenda: 3/4/2025 Final action:
Title: Approval of and authorization to execute Agreement for Professional Consultant Services with Kimley-Horn and Associates, Inc. for the Dallas Street Improvements from Main Street to 9th Street (Project Number ST25320)
Attachments: 1. _BA_ST25320_Dallas_St_Rehab_-_AE_Agreement_KH (1)
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow City Council

Meeting of: 03-04-2025

 

Title:

title

Approval of and authorization to execute Agreement for Professional Consultant Services with Kimley-Horn and Associates, Inc. for the Dallas Street Improvements from Main Street to 9th Street (Project Number ST25320)  

End

 

Background:

Engineering & Construction Department staff negotiated an Agreement for Professional Consultant Services with Kimley-Horn and Associates, Inc. to provide design services for the 2018 GO Bond Proposition 1 project Dallas Street Improvements from Main Street to 9th Street. The agreement includes design services to provide conceptual plans for three options:

Option 1 - pavement mill/patch/overlay with no drainage improvements;

Option 2 - pavement mill/patch/overlay with drainage improvements utilizing curb/gutter and paved flumes;

Option 3 - pavement mill/patch/overlay, widening to 3-lanes with curb/gutter, and enclosed storm sewer drainage improvements. 

Sidewalk improvements, along the north side of Dallas only, are also included in all three options and the consultant will develop cost estimates for each option as part of the negotiated services.

Upon completion of the conceptual design phase, staff will bring the three options before the governing body for review and direction from council regarding selection of the final design option.  At this time, a design amendment will be required to complete preparation of final construction documents.    

 

Cost:                                                                $45,200.00

Funding Source:                     2018 GO Bond Proposition 1

Requested By:                      Charlie Bright, P.E., Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          Agreement for Professional Consultant Services

 

Recommendation:

recommend

Approve and authorize execution of Agreement for Professional Consultant Services with Kimley-Horn and Associates, Inc. for the Dallas Street Improvements from Main Street to 9th Street project.

end