Title: Acceptance of the Drainage Advisory Committee’s recommendation to close project SW23060 Dallas and 4th Storm Sewer Replacement Design and return the $5,251.33 of the 2018 General Obligation Bond funds to the appropriate basin
Attachments: 1. 20261016 SW23060 Dallas 4th Design Closeout
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Drainage Advisory Committee

Meeting of: 11-16-26

 

Title:

title

Acceptance of the Drainage Advisory Committee’s recommendation to close project SW23060 Dallas and 4th Storm Sewer Replacement Design and return the $5,251.33 of the 2018 General Obligation Bond funds to the appropriate basin

End

 

Background:

The project SW23060 Dallas and 4th Storm Sewer Replacement Design was for assistance with the mitigation of erosion in the areas where storm lines crossed the driveways of citizens along Dallas Street West of 4th St

Council approved $26,000.00 of funds to contract with an outside engineer to develop a solution for this area

Staff contracted with an outside engineer to design the solution. This contract was for $20,748.67

The remaining balance of $5,251.33 is to be transferred back into the corresponding basin fund

This is in the Haikey Creek Basin

 

Cost:                                                                $0.00

Funding Source:                     2018 GO Bond, Proposition 6

Requested By:                      Charlie Bright, P.E., Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          20261016 SW23060 Dallas 4th Desing Closeout   

 

Recommendation:

recommend

Accept the Drainage Advisory Committee Recommendation to close project SW23060 Dallas and 4th Storm Sewer Replacement Design and return the $5,251.33 of the 2018 General Obligation Bond funds to the appropriate Basin