Acceptance of the Drainage Advisory Committee’s recommendation to close project SW23060 Dallas and 4th Storm Sewer Replacement Design and return the $5,251.33 of the 2018 General Obligation Bond funds to the appropriate basin
End
Background:
The project SW23060 Dallas and 4th Storm Sewer Replacement Design was for assistance with the mitigation of erosion in the areas where storm lines crossed the driveways of citizens along Dallas Street West of 4th St
Council approved $26,000.00 of funds to contract with an outside engineer to develop a solution for this area
Staff contracted with an outside engineer to design the solution. This contract was for $20,748.67
The remaining balance of $5,251.33 is to be transferred back into the corresponding basin fund
This is in the Haikey Creek Basin
Cost: $0.00
Funding Source: 2018 GO Bond, Proposition 6
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: 20261016 SW23060 Dallas 4th Desing Closeout
Recommendation:
recommend
Accept the Drainage Advisory Committee Recommendation to close project SW23060 Dallas and 4th Storm Sewer Replacement Design and return the $5,251.33 of the 2018 General Obligation Bond funds to the appropriate Basin