Approval of and authorization to execute Resolution No. 1774, a Resolution authorizing acceptance of a General Warranty Deed for Parcel 3.0, consisting of 8,270.64 square feet of permanent Right-of-Way and Parcel 4.0, consisting of 12,537.40 square feet of permanent Right-of-Way, located at 2204 East Houston Street in Broken Arrow, Oklahoma, in the Southeast Quarter of Section 12, Township 18 North, Range 14 East, Tulsa County, Oklahoma, from Sam Azarian and Maureen Azarian and authorization of payment in the amount of $80,510.00 for the Houston Street Improvements from 9th Street to Old Hwy 51, Parcels 3.0 and 4.0 (Project No. ST1926B)
End
Background:
The attached General Warranty Deed is being conveyed to the City of Broken Arrow, a municipal corporation, from Sam Azarian and Maureen Azarian, the owner. Parcel 3.0 consists of 8,270.64 square feet of permanent Right-of-Way and Parcel 4.0 consists of 12,537.40 square feet of permanent Right-of-Way, located at 2204 East Houston Street in Broken Arrow, Oklahoma, in the Southeast Quarter of Section 12, Township 18 North, Range 14 East, Tulsa County, Oklahoma. Sam Azarian and Maureen Azarian have accepted the following offer, made subject to City Council approval:
Parcel 3.0 Permanent Right of Way: 0.19 Acres @ $120,000/Acre = $22,800
Parcel 4.0 Permanent Right of Way: 0.29 Acres @ $120,000/Acre = $34,800 Total: $57,600
Improvements to be Acquired:
Acquire gravel: 300 Square feet (SF) @ $2.25/SF = $675
Acquire concrete: 750 SF @ $10.00/SF x 0% depreciated = $7,500 Total: $8,175
Items to be Replaced/Relocated:
Replace double gates: 2 double gates @ $1,500/ea = $3,000; Replace wire fencing at entry: 60 Linear Feet (LF) @ $8.00/LF = $480; Replace single gate: 1 @ $1,250 = $1,250; Replace landscaped shrubs at entrance: 2 @ $250/ea = $500 Total: $5,230
Settlement Cost: $9,500
Total Just Compensation Amount (Rounded) = $80,510.00