Broken Arrow Drainage Advisory Committee
Meeting of: 07-27-26
Title:
title
Authorization to close project SW24020 W Fargo Dr Drainage Improvements and return the $48,554.41 of the 2018 General Obligation Bond funds to the appropriate basin. Original Agenda Item Number 23-873
End
Background:
The project SW24020 W Fargo Dr Drainage Improvements was to design drainage improvements to keep water off the sidewalks along a street in the Stone Wood Crossing subdivision.
Council approved $55,000.00 of funds for design and installation of a drainage system to transport the groundwater into the storm sewer system.
The system was designed in-house. The construction was completed by the City’s Streets and Stormwater team. The total cost of the project was $6,445.59 leaving the project with a balance of $48,554.41
This is in the Haikey Creek Basin
Cost: $0.00
Funding Source: 2018 GO Bond, Proposition 6
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: Project Close Out Form
Recommendation:
recommend
Authorize the closing of the project SW24020 W Fargo Dr Drainage Improvements and return the $48,554.41 of the 2018 General Obligation Bond funds to the appropriate Basin. Original Agenda Item number 23-873