Title: Authorization to close project SW24020 W Fargo Dr Drainage Improvements and return the $48,554.41 of the 2018 General Obligation Bond funds to the appropriate basin. Original Agenda Item Number 23-873
Attachments: 1. SW24020_W_Fargo_Close_out_Signed
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Drainage Advisory Committee

Meeting of: 07-27-26

 

Title:

title

Authorization to close project SW24020 W Fargo Dr Drainage Improvements and return the $48,554.41 of the 2018 General Obligation Bond funds to the appropriate basin. Original Agenda Item Number 23-873

End

 

Background:

The project SW24020 W Fargo Dr Drainage Improvements was to design drainage improvements to keep water off the sidewalks along a street in the Stone Wood Crossing subdivision.

Council approved $55,000.00 of funds for design and installation of a drainage system to transport the groundwater into the storm sewer system.

The system was designed in-house. The construction was completed by the City’s Streets and Stormwater team. The total cost of the project was $6,445.59 leaving the project with a balance of $48,554.41

This is in the Haikey Creek Basin

 

Cost:                                                                $0.00

Funding Source:                     2018 GO Bond, Proposition 6

Requested By:                      Charlie Bright, P.E., Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          Project Close Out Form   

 

Recommendation:

recommend

Authorize the closing of the project SW24020 W Fargo Dr Drainage Improvements and return the $48,554.41 of the 2018 General Obligation Bond funds to the appropriate Basin. Original Agenda Item number 23-873