Broken Arrow City Council
Meeting of: 11/19/24
Title:
title
Acceptance of the Drainage Advisory Committee’s recommendation to approve expenditure of 2018 General Obligation (GO) Bond, Proposition 6 funds for construction of erosion mitigation and repair the leaking pond spillway at Shenandoah Valley at Battle Creek
End
Background:
The case was brought before the Drainage Advisory Committee on October 28, 2024. The Committee voted 7-0 to recommend approval of expenditure of funds.
The proposed project in Reserve A of the Shenandoah Valley at Battle Creek subdivision is to mitigate erosion and construct repairs to the leaking detention pond spillway.
The Property Owners Association (POA) is requesting a partnership with the City to repair the leaking pond. The DAC previously approved funds for an engineering study that was completed in 2023. The POA has contracted with a private firm to complete the construction plans that were completed in September 2024.
Site investigations confirmed that the pond is leaking and eroding around the spillway and that a 10-inch sanitary sewer is directly under the spillway. This area flows to Ford Creek (Unnamed).
Cost: $45,000.00
Funding Source: 2018 GO Bond, Proposition 6
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: Drainage Report, Exhibits
Recommendation:
recommend
Accept the Drainage Advisory Committee’s recommendation to approve expenditure of 2018 GO Bond, Proposition 6 funds for construction of erosion mitigation and repair the leaking pond spillway at Shenandoah Valley at Battle Creek.
end