Broken Arrow Drainage Advisory Committee
Meeting of: 11-16-26
Title:
title
Acceptance of the Drainage Advisory Committee’s recommendation to close project SW22030 Jasper St and 7th Drainageway and return the $99,010.00 of the 2018 General Obligation Bond funds to the appropriate basin. Original Agenda Item Number 21-1297
End
Background:
The project SW22030 Jasper St and 7th Drainageway was to design drainage improvements for a channel running along the Lakes at Indian Springs that was causing erosion.
Council approved $125,000.00 of funds for design and installation of channel improvements to mitigate the erosion.
City Staff contracted with a survey company for $990.00, designed the solution inhouse and contracted with a landscaping company to perform the repairs for $25,000.00. The total project cost was $25,990.00 leaving a balance of $99,010.00 in the project
This is in the Broken Arrow Creek Basin
Cost: $0.00
Funding Source: 2018 GO Bond, Proposition 6
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: 20260722 SW22030 Jasper and 7th Closeout Signed
Recommendation:
recommend
Accept the Drainage Advisory Committee Recommendation to close project SW22030 Jasper St and 7th Drainageway and return the $99,010.00 of the 2018 General Obligation Bond funds to the appropriate Basin. Original Agenda Item number 21-1297