File #: 26-1780    Name:
Type: Consent Item Status: Agenda Ready
File created: 11/9/2026 In control: Broken Arrow City Council
On agenda: 11/16/2026 Final action:
Title: Acceptance of the Drainage Advisory Committee’s recommendation to close project SW22030 Jasper St and 7th Drainageway and return the $99,010.00 of the 2018 General Obligation Bond funds to the appropriate basin. Original Agenda Item Number 21-1297
Attachments: 1. 20260722 SW22030 Jasper and 7th Closeout Signed
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Drainage Advisory Committee

Meeting of: 11-16-26

 

Title:

title

Acceptance of the Drainage Advisory Committee’s recommendation to close project SW22030 Jasper St and 7th Drainageway and return the $99,010.00 of the 2018 General Obligation Bond funds to the appropriate basin. Original Agenda Item Number 21-1297

End

 

Background:

The project SW22030 Jasper St and 7th Drainageway was to design drainage improvements for a channel running along the Lakes at Indian Springs that was causing erosion. 

Council approved $125,000.00 of funds for design and installation of channel improvements to mitigate the erosion.

City Staff contracted with a survey company for $990.00, designed the solution inhouse and contracted with a landscaping company to perform the repairs for $25,000.00. The total project cost was $25,990.00 leaving a balance of $99,010.00 in the project

This is in the Broken Arrow Creek Basin

 

Cost:                                                                $0.00

Funding Source:                     2018 GO Bond, Proposition 6

Requested By:                      Charlie Bright, P.E., Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          20260722 SW22030 Jasper and 7th Closeout Signed   

 

Recommendation:

recommend

Accept the Drainage Advisory Committee Recommendation to close project SW22030 Jasper St and 7th Drainageway and return the $99,010.00 of the 2018 General Obligation Bond funds to the appropriate Basin. Original Agenda Item number 21-1297