Legislation Details

File #: 26-1574    Name:
Type: Consent Item Status: Agenda Ready
File created: 9/28/2026 In control: Broken Arrow Municipal Authority
On agenda: 10/6/2026 Final action:
Title: Approval of and authorization to execute a Professional Consultant Agreement with Holloway, Updike and Bellen, Inc. for the Berwick Lift Station Rehabilitation (Project 2754390)
Attachments: 1. Berwick LS Agreement.Legal Signed - 2754390
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Municipal Authority

Meeting of: 10-06-2026

 

Title:

title

Approval of and authorization to execute a Professional Consultant Agreement with Holloway, Updike and Bellen, Inc. for the Berwick Lift Station Rehabilitation (Project 2754390)

End

 

Background:

This project consists of designing and preparing construction documents for the Berwick Lift Station located at 6222 W. Durham St., Broken Arrow, OK 74011. This shall include but is not limited to; designing rehabilitation of the lift station, construction plans detailing intent of the project, bid document quantities, standard details and drawings associated with project specifics, and construction specifications. This lift station has aging electrical and generator equipment, frequent power quality issues, corroded wet well and limited access. The Engineering and Construction Department conducted an assessment of all of the lift stations in the Sanitary Sewer System and the Berwick Lift Station was identified as a priority for rehabilitation. Due to age and equipment issues, it is  recommended to be replaced with a new submersible station. 

Engineering and Construction Department negotiated a Professional Consultant Agreement with Holloway, Updike and Bellen, Inc. for a fee of $75,670.00 to design and prepare construction documents for the rehabilitation of the Berwick Lift Station.

 

Cost:                                                                $75,670.00

Funding Source:                     OWRB Loan

Requested By:                      Charlie Bright, P.E., Director of Engineering & Construction

Approved By:                      City Manager’s Office

Attachments:                                          Berwick LS Agreement.Legal Signed - 2754390

 

Recommendation:

recommend

Approve and authorize execution of a Professional Consultant Agreement with Holloway, Updike and Bellen, Inc. for the Berwick Lift Station Rehabilitation (Project 2754390)

end