Broken Arrow Municipal Authority
Meeting of: 10-06-2026
Title:
title
Approval of and authorization to execute a Professional Consultant Agreement with Holloway, Updike and Bellen, Inc. for the Berwick Lift Station Rehabilitation (Project 2754390)
End
Background:
This project consists of designing and preparing construction documents for the Berwick Lift Station located at 6222 W. Durham St., Broken Arrow, OK 74011. This shall include but is not limited to; designing rehabilitation of the lift station, construction plans detailing intent of the project, bid document quantities, standard details and drawings associated with project specifics, and construction specifications. This lift station has aging electrical and generator equipment, frequent power quality issues, corroded wet well and limited access. The Engineering and Construction Department conducted an assessment of all of the lift stations in the Sanitary Sewer System and the Berwick Lift Station was identified as a priority for rehabilitation. Due to age and equipment issues, it is recommended to be replaced with a new submersible station.
Engineering and Construction Department negotiated a Professional Consultant Agreement with Holloway, Updike and Bellen, Inc. for a fee of $75,670.00 to design and prepare construction documents for the rehabilitation of the Berwick Lift Station.
Cost: $75,670.00
Funding Source: OWRB Loan
Requested By: Charlie Bright, P.E., Director of Engineering & Construction
Approved By: City Manager’s Office
Attachments: Berwick LS Agreement.Legal Signed - 2754390
Recommendation:
recommend
Approve and authorize execution of a Professional Consultant Agreement with Holloway, Updike and Bellen, Inc. for the Berwick Lift Station Rehabilitation (Project 2754390)
end