Background:
The design agreement the Engineering and Construction Department negotiated with Freese and Nichols, Inc. includes erosion mitigation along the bank of Adams Creek adjacent to the Preserve Park Regional Detention pond. During the design process it was determined that a dam breach hazard classification study was needed on the existing detention pond that is adjacent to Adams Creek.
This amendment is a rescoping of the original contract to address the hazard classification of the pond at Preserve Park. There is no additional fee associated with this amendment.
Cost: $0.00
Funding Source: 2018 General Obligation Bond, Proposition 6 funds
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: 20250904-Preserve Park Amendment 1. Legal signed-SW24070
Recommendation:
recommend
Approve and authorize execution of Amendment No. 1 to the Agreement for Professional Consultant Services with Freese and Nicholes for the design plans to mitigate erosion along Adams Creek adjacent to the Preserve Park Regional Detention Pond