LEGISLATIVE RESEARCH CENTER
File #: 18-192    Name:
Type: Consent Item Status: Agenda Ready
File created: 1/17/2018 In control: Broken Arrow City Council
On agenda: 2/6/2018 Final action:
Title: Approval of PT17-104, Conditional Final Plat, Top Dog Training Facility, 1 lot, 4.14 acres, A-1 to PUD (Planned Unit Development) 264/A-1, northeast corner of Tucson Street and 9th Street
Attachments: 1. 2-CHECKLIST.TOP DOG.pdf, 2. 3-CONDITIONAL FINAL PLAT.TOP DOG.pdf

Broken Arrow City Council

Meeting of: 02-06-2018

 

To:                     Mayor and City Council Members

From:                     Development Services Department

Title: 

title

                     Approval of PT17-104, Conditional Final Plat, Top Dog Training Facility, 1 lot, 4.14 acres, A-1 to PUD (Planned Unit Development) 264/A-1, northeast corner of Tucson Street and 9th Street

End

Background:

The conditional final plat of Top Dog contains 4.14 gross acres located on the northeast corner of Tucson Street and 9th Street, south of the Creek Turnpike.  Applicant is proposing to construct “Top Dog”, a training, boarding, and daycare facility for dogs.  PUD-264, which was submitted in conjunction with the preliminary plat, was approved by the City Council on July 18, 2017, subject to the property being platted. The property is zoned A-1 (Agriculture), which requires a minimum lot size of 5.00 acres.  With PUD-264, applicant requested that the minimum lot size be reduced to 3.25 acres and has stipulated that no lot splits will be allowed on the property.  The preliminary plat for Top Dog Training Facility was approved by the Planning Commission on June 22, 2017, subject to an attached checklist.

 

Right-of-way will be dedicated along Tucson Street in accordance with the Subdivision Regulations.  As part of the development of the Creek Turnpike, the Oklahoma Turnpike Authority acquired right-of-way along 9th Street for construction of the bridge over the Creek Turnpike.  To accommodate the slope associated with the bridge, part of the existing right-of-way along 9th Street exceeds the minimum requirements of the Subdivision Regulations.  Where right-of-way has not been provided along 9th Street in accordance with the Subdivision Regulations, it will be dedicated as part of this plat.  As per PUD-264, sidewalks will be constructed along both 9th Street and Tucson Street in accordance with the Subdivision Regulations or funds placed in escrow for construction of the sidewalks in the future.

 

The City of Broken Arrow will provide water and sanitary sewer service to this property. 

 

The east side of the property contains the 100-year floodplain of the west branch of Broken Arrow Creek.  As per the Subdivision Regulations, the 100-year floodplain area has been placed in a reserve area.  The reserve area will be maintained by the property owner.

 

On January 11, 2018, the Planning Commission recommended approval (4-0) of the conditional final plat, subject to the attached checklist.

                     

Cost:                                                                $0

 

Prepared By:                                           Brent Murphy, AICP, Senior Planner

 

Reviewed By:                                          Development Services Department
                                    Assistant City Manager, Operations
                                    Legal Department

Approved By:                      Michael L. Spurgeon, City Manager

 

Attachments:                                          Fact Sheet, Planning Commission
                                    Checklist
                                    Conditional Final Plat

Recommendation:

Approve PT17-104, Conditional Final Plat for Top Dog Training Facility, subject to the attached checklist, as recommended by the Planning Commission, Technical Advisory Committee, and Staff.

 

BDM