LEGISLATIVE RESEARCH CENTER
File #: 16-1356    Name:
Type: Consent Item Status: Passed
File created: 11/1/2016 In control: Broken Arrow City Council
On agenda: 11/7/2016 Final action: 11/7/2016
Title: Approval of bids received, award of the lowest responsible bid to Cherokee Pride Builders, and approval of and authorization to execute a construction contract for Liberty Parkway Trail Retaining Wall Repair (Project No. 161713)
Attachments: 1. 161102 Certified Bid Tab Liberty Parkway Retaining Wall Repair

Broken Arrow City Council

                                                                                               Meeting of: 11-07-16

                                                                                    

To:                     Mayor and City Council

From:                     Engineering and Construction Department

Title: 

title

                     Approval of bids received, award of the lowest responsible bid to Cherokee Pride Builders, and approval of and authorization to execute a construction contract for Liberty Parkway Trail Retaining Wall Repair (Project No. 161713)

End

Background:

Liberty Parkway Trail Retaining Wall Repair is a Sales Tax Capital Improvements (STCI) project to repair a segmental block wall along the north side of the Liberty Parkway Trail east of Elm Place.  The wall collapsed under the pressure of stormwater building up behind it heavy rains. Olsson and Associates, Inc., designed the project improvements with two schedules, the selection of which schedule to be determined by the City.  Schedule A requires the contractor to use all new blocks.  Schedule B allows the contractor to re-use as many of the blocks in the failed wall as possible.

 

The project was advertised for bids on September 13 and 20, 2016.  A mandatory pre-bid meeting was held on October 13, 2016.  Bids were opened on November 1, 2016.  There were five (5) bidders, but one bid was rejected because the bidder did not turn in the bid book in accordance with the Instructions to Bidders.  Of the four (4) remaining bids received, Cherokee Pride Construction submitted the low bid of $186,044.60 for Schedule A and $173,494.60 for Schedule B.  The Engineer’s estimate was $256,796.00 for Schedule A and $200,546.00 for Schedule B.  The Certified Bid Tabulation is attached.  To reduce the risk of failures and extend the life of the repaired wall, Staff recommends that the low bid for Schedule A be selected.

 

Staff recommends awarding the contract in the amount of $186,044.60 to Cherokee Pride Construction.

 

Funding for the improvements will be from Sales Tax Capital Improvements.


Cost:                                                                $186,044.60

Prepared By:                                           Alex M. Mills, P.E., Director of Engineering and Construction

Reviewed By:                                          Parks Department
                                    Finance Department
                                    Assistant City Manager - Operations
                                    Legal Department                       

 

Approved By:                      Michael L. Spurgeon, City Manager
                                   

Attachments:                                          Certified Bid Tabulation

Recommendation:

Award the lowest responsible bid to Cherokee Pride Construction, and approve and authorize execution of a construction contract for Liberty Parkway Trail Retaining Wall Repair.