Title: Consideration, discussion and possible award of the lowest responsible bid to Northeastern Irrigation & Landscape, Inc., and approve and authorize execution of a construction contract for the Broken Arrow Gateways Entry Signage Project (Project No. 201710)
Attachments: 1. 201710_-_Gateway_Bid_Tab

Broken Arrow City Council

Meeting of: 10-15-2024

 

Title:

title

Consideration, discussion and possible award of the lowest responsible bid to Northeastern Irrigation & Landscape, Inc., and approve and authorize execution of a construction contract for the Broken Arrow Gateways Entry Signage Project (Project No. 201710)

End

 

Background:

This project began in 2020 with the idea of creating monument signs at our arterial entrances to the City. GH2 Architects, LLS was hired to create a map of proposed Gateway locations broken into different tiers based upon the volume of traffic in that area as well as design the primary, secondary, and tertiary Gateways. Since this original agreement was executed, a subcommittee was created by the planning commission to work with GH2 to ensure that the Gateway designs best represented what The City wanted. This subcommittee met for several months fine tuning the details of this design. After the designs were approved by the subcommittee GH2 created construction documents for four (4) Primary Signs, two (2) Secondary Signs, and eight (8) Tertiary Signs located throughout the City of Broken Arrow.

The project was advertised on September 10 and September 17, 2024. A Pre-Bid meeting was held on September 17, 2024. There were two bids received on October 8, 2024. The Certified Bid Tabulation is attached. This project included Schedule 1: Primary Sign A, Schedule 2: Primary Sign B, Schedule 3: Primary Sign C, Schedule 4: Primary Sign D, Schedule 5: Secondary Sign E, Schedule 6: Secondary Sign F, Schedule 7: Tertiary Signs, and Schedule 8: Electrical Coordination Allowance of $140,000. All eight Schedules are recommended to be awarded. The lowest reasonable bid for these items was from Northeastern Irrigation & Landscape, Inc. for $819,207.65 where $140,000 is held in contingency for Electrical Coordination. The Engineer’s Estimate was $802,504.50.

 

Cost:                                                                $819,207.65

Funding Source:                     2018 GO Bond

Requested By:                      Charlie Bright, P.E., Director of Engineering & Construction

Approved By:                      City Manager’s Office

Attachments:                                          Certified Bid Tab

Recommendation:

recommend

Award the lowest responsible bid to Northeastern Irrigation & Landscape, Inc., and approve and authorize execution of a construction contract for the Broken Arrow Gateways Entry Signage Project (Project No. 201710)

end