File #: 17-2473    Name:
Type: Consent Item Status: Agenda Ready
File created: 7/24/2017 In control: Broken Arrow Municipal Authority
On agenda: 8/1/2017 Final action:
Title: Approval of and authorization to execute Amendment No. 2 to a Professional Consultant Agreement with Holloway, Updike and Bellen, Inc. (HUB) for Design of a 24-inch waterline from the Battle Creek Storage Tank to the distribution system (Project No. WL1609)
Attachments: 1. Amendment No. 2.pdf

Broken Arrow Municipal Authority

                                                                                               Meeting of: 08-01-2017

                                                                                    

To:                     Chairman and Authority Members

From:                     Engineering and Construction Department

Title: 

title

                     Approval of and authorization to execute Amendment No. 2 to a Professional Consultant Agreement with Holloway, Updike and Bellen, Inc. (HUB) for Design of a 24-inch waterline from the Battle Creek Storage Tank to the distribution system (Project No. WL1609)

End

Background:

This is a project that was included in Oklahoma Water Resources Board (OWRB) Loan No. FAP-16-001L.  This project will improve operation of the Battle Creek Storage Tank, allowing it to operate more closely with the Tiger Hill Storage Tanks.  It will also increase the volume of water available in this area. 

 

During the right-of-way acquisition process, it was determined the design plans had the alignment proceeding through land that was scheduled for development.  An alternate route or alignment for the waterline was discussed. This amendment number 2 is for the additional survey and design for the new alignment.  The new alignment to be designed will follow the north boundary of the Pack property to the east right-of-way (ROW) of 161st East Avenue.  It will proceed north staying in the ROW of 161st East Avenue to 51st Street.  Funding for this amendment is available in the existing OWRB loan.  


Cost:                                                                $24,500.00

Prepared By:                                           Alex M. Mills, P.E., Engineering and Construction Director

Reviewed By:                                          Utilities Department
            Finance Department
            Legal Department
            Assistant City Manager - Operations                                

Approved By:                      Michael L. Spurgeon, City Manager
                               

Attachments:                                          Professional Consultant Agreement

Recommendation:

Approve and authorize execution Amendment No. 2 to the Professional Consultant Agreement with Holloway, Updike and Bellen, Inc., for design of a 24-inch waterline from the Battle Creek Storage Tank to the distribution system.