File #: 24-1230    Name:
Type: Consent Item Status: Agenda Ready
File created: 9/9/2024 In control: Broken Arrow Municipal Authority
On agenda: 9/17/2024 Final action:
Title: Approval of and authorization to execute Change Order No. 1 with Cherokee Pride Construction Inc. on Construction Contract No. WL23010 Freeport Street from Birch Avenue to Main Street and Main Street from Elgin Street to Midway Avenue Waterline Improvements
Attachments: 1. WL23010_-_Change_Order__1_v2
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Municipal Authority

Meeting of: 09-17-2024

 

Title:

title

Approval of and authorization to execute Change Order No. 1 with Cherokee Pride Construction Inc. on Construction Contract No. WL23010 Freeport Street from Birch Avenue to Main Street and Main Street from Elgin Street to Midway Avenue Waterline Improvements

End

Background:

The project consists of constructing a new 8” waterline to replace and improve 4” and 6” waterlines in the existing water distribution system. Approximately 1640 linear feet of 8” water main will be constructed along Freeport Street and Main Street and approximately 150 feet of 6” water main across Main Street and along Freeport. There are 3 open cut street crossings, two across Main Street and one across Freeport Street for continuity, connections to existing waterlines, and water accessories such as fire hydrants.

The project was advertised on November 20th and 27th, 2023. There were four (4) bids received on December 11th, 2023 with the lowest responsible bidder being Cherokee Pride Construction Inc. with a bid of $483,140.00.

This Change Order No. 1 addresses the following additions to the contract:

                     At the direction of COBA engineering and construction staff, additional quantities of repair have been identified for work above and beyond the original quantity within the contract, but still within the scope of the project work within the project corridor. These items include additional concrete pavement patches due to unforeseen grade and pavement conditions, subgrade modifications, and additional sidewalk. The line item quantities noted within this change order shall be extended such to contractually cover the associated additional work.

                     At the direction of COBA engineering and construction staff, additional quantities of construction have been identified for work above and beyond the original quantity within the contract, but still within the scope of the project work within the project corridor. These items include additional fittings due to unforeseen necessary vertical and horizontal alignment change. The line item quantities noted within this change order shall be extended such to contractually cover the associated additional work.

Contract Time Adjustments:

                     Additional time consideration is not needed.

 

The additional cost associated with these changes is as follows:

Previous Change Orders:                                          $0.00

This Change Order:                                                               $26,335.00

Total Cost of Change Orders:                                          $26,335.00

Original Contract Amount:                                          $483,140.00

Revised Contract Amount:                                          $509,475.00

Percent Change in Contract:                                          5.45%

Applicable to Comp. Bid Act:                     0.00%

 

 

Cost:                                                                $26,335.00

Funding Source:                     CDBG and Utilities Capital

Requested By:                      Charlie Bright, PE; Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          WL23010 - Change Order No. 1 v2

 

Recommendation:

recommend

Approve and authorize the execution of Change Order No. 1 with Cheroke Pride Construction Inc. on Construction Contract No. WL23010 Freeport Street from Birch Avenue to Main Street and Main Street from Elgin Street to Midway Avenue Waterline Improvements

end