Legislation Details

File #: 26-497    Name:
Type: Public Hearings Status: Agenda Ready
File created: 4/7/2026 In control: Planning Commission
On agenda: 5/14/2026 Final action:
Title: Public hearing, consideration, and possible action regarding SP-002762-2026, Public Safety Telecommunications Tower, 10.58 acres, CN (Commercial Neighborhood), southwest corner of W. Jasper Street (131st Street) & S. Aspen Avenue (145th East Avenue)
Attachments: 1. 1 Case Map, 2. 2 Aerial Map, 3. 3 Comm Tower Exhibit, 4. 4 Propagation Map

Broken Arrow Planning Commission

05-14-2026

 

To:                     Chairman and Commission Members

From:                     Community Development Department

Title: 

title

Public hearing, consideration, and possible action regarding

SP-002762-2026, Public Safety Telecommunications Tower, 10.58 acres, CN (Commercial Neighborhood), southwest corner of W. Jasper Street (131st Street) & S. Aspen Avenue (145th East Avenue)

End

Background:                                          

In 2014, the Citizens of Broken Arrow voted to approve a bond project to improve first responder radio communications in South Broken Arrow.                     

                                          

Applicant:                                          City of Broken Arrow

Owner:                     City of Broken Arrow

Developer:                                          City of Broken Arrow

Engineer:                                          MRL Communications Engineers

Location:                                          Southwest corner of W. Jasper Street (131st Street) & S. Aspen Avenue  
(145th East Ave.)

Size of Tract                                          10.58 acres

Number of Lots:                     1

Present Zoning:                     CN (Commercial Neighborhood)

Comp Plan:                                          Level 4 (Commercial/Employment Nodes)

 

SP-002762-2026 is a request for a Specific Use Permit for a freestanding telecommunications tower on city property zoned CN (Commercial Neighborhood) that is located on the southwest corner of W. Jasper Street (131st Street) and S. Aspen Avenue (145th East Ave.). This is an undeveloped l0.58-acre tract of land already owned by the City of Broken Arrow.

 

Section 2-7-2 Telecommunication Towers outlines certain factors that City Council can approve. Two factors are requested for this application:

 

1.                     Height: proposed communications tower will be approximately 180 feet in height. By ordinance, up to 120 feet is allowable by right in commercial districts, while up to 200 feet is allowable by right in industrial districts. The height necessity comes from low-lying topography and the need to fill geographic coverage gaps in the area.

2.                     Co-location: proposed communications tower would have the ability for co-location in the future. This minimizes the quantity of towers and increases project viability.  

 

This is a public safety project to boost communication coverage for first responders in South Broken Arrow. This project is one of the last projects of the 2014 GO Bond package. Broken Arrow participates in a mutual aid coverage network with surrounding communities that makes up the third largest radio network in the state. City Council approved the consultant agreement for the engineering and design of this tower on April 15, 2025 (Project 191793). The existing tree coverage will be preserved to provide a natural landscape buffer to surrounding properties. A driveway will be constructed with access from Aspen Avenue.

 

SURROUNDING LAND USES/ZONING/COMPREHENSIVE PLAN

 

The surrounding properties contain the following uses, along with the following development guide and zoning designations:

 

Location

Comprehensive Plan

Zoning

Land Use

North

Level 3/ FP

RM (Multi-Family)

Single-Family Estates

East

Level 4

CN (Commercial Neighborhood)

Commercial

South

Level 3

RM (Multi-Family)

Undeveloped

West

FP

Floodplain

Undeveloped

According to FEMA Maps, a portion of this property is located within the 100-year floodplain (Zone AE); however, the driveway access and pad site with be outside of the floodplain in Zone X.

 

Since publishing the public hearing notice for this request, staff determined that the legal description for the project site only included a portion of the project site. Staff recommends that this item be tabled to the June 11, 2026, Planning Commission meeting to allow time to re-notice the proposed Specific Use Permit using the full legal description.

 

 

Attachments:                        Case Map
                                    Aerial Map
                           Cell Tower Exhibit
                           Propagation Map 

 

Recommendation:                      

Table SP-002762-2026 per to the June 11, 2026, Planning Commission meeting.

 

Reviewed by:  Jane Wyrick

Approved by:  Rocky Henkel

RLB