Title: Approval of and authorization to award the lowest responsible bid to Scissor Tail Construction, and approve and authorize execution of construction contract for Indian Spring Sport Center Baseball Shade Structures (Project No. 2360350)
Attachments: 1. ISSC_Shade_StructureBid_Tab_-_Scissor_Tail_-_2360350
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow City Council

Meeting of: 09-15-2026

 

Title:

title

Approval of and authorization to award the lowest responsible bid to Scissor Tail Construction, and approve and authorize execution of construction contract for Indian Spring Sport Center Baseball Shade Structures (Project No. 2360350)

End

 

Background:

Indian Springs Sport Complex fields 9-16 have dated and limited shade and weather protection for spectators. In 2025 Garver was hired to design replacement Shade Structures and sidewalks for fields 9-16. These upgraded Shade Structures will match the shade structures at fields 1-8, and provide improved sun and weather protections for the spectators seating areas.

The project was advertised on August 13, 2026 and August 20, 2026. An optional Pre-Bid meeting was held on August 21, 2026. There were twelve (12) bids received on September 3, 2026. The Certified Bid Tabulation is attached. This project included a base bid for mobilization and construction staking; Alternate 1: to replace the shade structures and sidewalks at Fields 9-10; Alternate 2: to replace the shade structures and sidewalks at Fields 11-14; and Alternate 3: to replace the shade structures and sidewalks at Fields 15-16. The base bid, Alternate 2 and Alternate 3 are recommended to be awarded.

The lowest apparent bidder was OPW Commercial Services, who has withdrawn their bid. The lowest responsible bid for these items was from Scissor Tail Construction for $340,414.64. The Architects’ estimate for these items was $429,537.00.

 

Cost:                                                                $340,141.64

Funding Source:                     STCI and Parks and Recreation Capital Improvement Fund

Requested By:                      Charlie Bright, P.E., Director of Engineering & Construction

Approved By:                      City Manager’s Office

Attachments:                                          ISSC Shade Structure.Bid Tab - Scissor Tail - 2360350

 

Recommendation:

recommend

Approval and authorization to award the lowest responsible bid to Scissor Tail Construction, and approve and authorize execution of construction contract for Indian Spring Sport Center Baseball Shade Structures (Project No. 2360350)

end