Approval of and authorization to execute a Channel and Regional Detention Facility agreement between Immanuel Evangelical Lutheran Church, Inc. and the City of Broken Arrow, located approximately quarter mile south of Kenosha and east side of Aspen Avenue, Broken Arrow, Tulsa County, State of Oklahoma
End
Background: Immanuel Evangelical Church (IEL) approached the City in 2015 regarding drainage erosion along a branch of upper Haikey Creek. The Creek has washed away a large area adjacent to the west abutment and scoured away the embankment on both sides of the channel east of Aspen that is undermining sewer service line, the Church drive and dental parking lot. Most of the material that has eroded has deposited in the regional pond to the east of Aspen on the Church property. The detention pond is a flow-by type facility that drains back to the Creek before flowing south into Country Aire Subdivision.
The Creek drains most of the Kenosha and Aspen Intersection and surrounding areas. The Creek daylights along and parallel to Aspen in front of the Church before entering a large double box skewed culvert. The culvert directs the drainage due west along the Church property line with the Aspen Business Park before turning south toward Country Aire subdivision. When the Creek turns south, there is a regional flow-by detention facility.
When the area developed and the detention pond was constructed in the late 1990s to early 2000s, an overland drainage easement was prepared for the detention pond but never executed.
In working with the Church and their Consultant, City staff agreed to participate in a channel and detention pond improvement project, along with a new overland drainage easement covering the regional detention pond. The easement documents are included as a separate submittal under the Consent agenda for acceptance and filing.
The City received internal approval to utilize Fee in-lieu-of funds up to $100,000 for the channel and detention pond project. A contract agreement was prepared along with design plans. The channel will be reshaped and include various erosion and stability measures, encasement of the sewer service line crossing and regrading of the detention pond back to original design.
The Engineers cost estimate is $247,404.68. The City’s portion is $100,000 and the Church would fund the remainder, $147,404.68. We are anticipating the project will bid in January and construction to commence in March.
City staff has reviewed the contract agreement and recommends approval.
Cost: $100,000 (Stormwater Fee in-lieu-of Fund)
Prepared By: Michael W. Skates, P.E., CFM, Development Services Director
Reviewed By: Engineering Department
Streets and Stormwater
Finance Department
Assistant City Manager - Operations
Legal Department
Approved By: Michael L. Spurgeon, City Manager
Attachments: Contract Agreement
Opinion of Probable Cost
Draft Final Plan Set
Recommendation: Approve the channel and regional detention facility agreement and authorize its execution.