LEGISLATIVE RESEARCH CENTER
File #: 16-1452    Name:
Type: Consent Item Status: Agenda Ready
File created: 12/7/2016 In control: Broken Arrow City Council
On agenda: 12/20/2016 Final action:
Title: Approval of bids received, award of the lowest responsible bid to RGroup, Inc., and approval of and authorization to execute a construction contract for Nienhuis Park Football Fields Synthetic Turf Conversion (Project No. 176020)
Attachments: 1. 161208 Bid Tab Certified, 2. 161212 CoBA Nienhuis Park - Bid Recommendation Letter - 121216

Broken Arrow City Council

                                                                                               Meeting of: 12-20-2016

                                                                                    

To:                     Mayor and City Council

From:                     Engineering and Construction Department

Title: 

title

                     Approval of bids received, award of the lowest responsible bid to RGroup, Inc., and approval of and authorization to execute a construction contract for Nienhuis Park Football Fields Synthetic Turf Conversion (Project No. 176020)

End

Background:

The four football fields at Nienhuis Park are currently natural grass fields.  Inclement weather and intense usage both cause degradation of the playing surfaces.  The synthetic turf conversion project for fields 2 and 3 will greatly increase the quality of the fields, as the underdrain system will remove stormwater from the fields, and the synthetic turf can support intense use of the fields without significant degradation.

The project was advertised for bids on November 8 and November 15, 2016.  Bids were opened on December 6, 2016.  Seven (7) bids were submitted.  Two bids were determined to be unresponsive.  The lowest responsible bidder was RGroup, Inc. in the amount of $1,191,632.00 for the base bid, $1,260,432.00 for the base bid + Alternate no. 1, $1,345,077.00 for the base bid + Alternate no. 2, and $1,413,877.00 for the base bid + Alternate no. 1 + Alternate no. 2.  The architect’s estimate was $1,214,000.00 for the base bid, $1,308,250.00 for the base bid + Alternate no. 1, $1,328,000.00 for the base bid + Alternate no. 2, and $1,422,250.00 for the base bid + Alternate no. 1 + Alternate no. 2.  The certified bid tabulation is attached.  Staff recommends award of the base bid construction contract to RGroup, Inc. as the lowest responsible bidder.  The recommendation letter from the architect is attached.

Partial funding for this work is from the 2011 and 2014 General Obligation Bonds ($1,141,632.00).  The Broken Arrow Youth Football League (BAYFL) is donating $50,000 for the construction of the project.

 

Cost:                                                                $1,191,632.00 (including $50,000.00 from the BAYFL)

Prepared By:                                           Alex M. Mills, P.E., CFM, Director of Engineering and Construction

Reviewed By:                                          Parks and Recreation Department
                                    Finance Department
                                    Assistant City Manager - Operations
                                    Legal Department

 

Approved By:                      Michael L. Spurgeon, City Manager
                                   

Attachments:                                          Architect’s Recommendation Letter
                                    Certified Bid Tabulation
                                   

Recommendation:

Award the lowest responsible bid to RGroup, Inc., and authorize execution of a construction contract.