Broken Arrow City Council
Meeting of: 02-17-2026
Title:
title
Ratification of prior approval and authorization to award the lowest responsible bid to Gober Construction LLC and approval and authorization to execute a construction contract for the Old Town Houston Street Storm Water Improvements Fort Worth Street to South 9th Street (Project SW26010)
End
Background:
This Project includes excavation, grading, creating a drainage channel, approximately 614 Linear Feet of 18” polypropylene drainage pipe, and culverts. Project also includes erosion control, removal and replacement of sidewalks and driveways, construction staking, and other utility construction activities. Project is to address erosion along the channel and improve stormwater flow along Houston St. This project is located along Houston Street from Fort Worth Street to South 9th Street in Broken Arrow, OK. Construction time for this contract will be One Hundred Fifty (150) Calendar days. This Project was advertised with the 12” Waterline and Bore Improvements in the same area (Project 2254401) to ensure proper coordination and efficiency with work for both projects.
At the City Council meeting held on November 17, 2025, City Council approved the award to the lowest responsible bidder, Gober Construction LLC, for the Old Town Houston St. Storm Water Improvements Fort Worth St. to S. 9th St. and authorized the execution of the construction contract. The approved lowest responsible bid was in the amount of $565,940.00, with an Engineer’s Estimate of $686,285.00. The approved funding mechanism to be utilized was the Storm Water Capital funds, however, the funding from Proposition 5 of the 2018 GoBond will also be utilized in the completion of this project.
Staff recommends ratifying the previously approved award of the lowest responsible bidder and authorization to execute a construction contract for the Old Town Houston St. Storm Water Improvements Fort Worth St. to S. 9th St.
Cost: $565,940.00
Funding Source: Storm Water Capital Funds
Proposition 5 of the 2018 GoBond
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: Old Town Houston St. Waterline Bore and Storm Water Improvements Fort Worth St. to S. 9th St. Certified Bid Tabulation
Recommendation:
recommend
Ratify the award to the lowest responsible bid to Gober Construction LLC. and approval and authorization of a construction contract for the Old Town Houston St. Storm Water Improvements Fort Worth St. to S. 9th St. (Project SW26010)
end