File #: 16-1065    Name:
Type: Consent Item Status: Passed
File created: 8/26/2016 In control: Broken Arrow City Council
On agenda: 9/6/2016 Final action: 9/6/2016
Title: Acceptance of a Utility Easement and Temporary Construction Easement for a tract of land that is part of Lot Seven (7) and Eight (8), Block One (1), East Haskell Addition, an addition to the City of Broken Arrow, Tulsa County, State of Oklahoma, according to the recorded plat thereof for the 9th Street widening from Elgin to El Paso (Project No. ST1210)
Attachments: 1. 30 cc UE Exhibit, 2. 30 cc TCE Exhibit

Broken Arrow City Council

                                                                                               Meeting of: 09-06-16

                                                                                    

To:                     Mayor and City Council

From:                     Department of Engineering and Construction

Title: 

title

                     Acceptance of a Utility Easement and Temporary Construction Easement for a tract of land that is part of Lot Seven (7) and Eight (8), Block One (1), East Haskell Addition, an addition to the City of Broken Arrow, Tulsa County, State of Oklahoma, according to the recorded plat thereof for the 9th Street widening from Elgin to El Paso (Project No. ST1210)

End

Background:

The attached Utility and Temporary Construction Easements are being provided by the Deborah Lee Spears Revocable Inter Vivos Trust by and through Deborah Lee Spears, Trustee.

 

Payment for the Temporary Construction Easement includes a temporary construction easement over the Permanent Utility Easement of 670 sf, as well as an additional standalone temporary construction easement of 335 sf totaling 1,005 sf. Staff has reviewed this action and recommends approval.

 

Funding for this project is from 2011 General Obligation Bond Issue.


Cost:                                                                Permanent Utility Easement: 670 SF @ $3.00/SF X 75% = $1,508.00
                                    Temporary Construction Easement: 1,005 SF @ 3.00/SF X 25% = $754.00
                                    Damages = $4,489.00
                                    Total Compensation                                              $  6,750.00              
                

Prepared By:                                           Alex Mills, P.E., CFM, Director of Engineering and Construction

 

Reviewed By:                                          Finance Department
                                    Assistant City Manager
                                    Legal Department                              

Approved By:                      Michael L. Spurgeon, City Manager                                    

Attachments:                                          Utility Easement                                                                              
                                    Temporary Construction Easement

Recommendation:                     Accept the Utility and Temporary Construction Easments.