Broken Arrow Drainage Advisory Committee
Meeting of: 04-27-2026
Title:
title
Consideration, discussion, and possible action to recommend to City Council to expend construction funds to construct drainage improvements near 8624 S. Harp Boulevard in the Cambridge Estates Subdivision (Case No. 26-005)
End
Background:
The proposed project is at 8624 S. Harp Blvd. in Broken Arrow.
A citizen contacted the City asking for help regarding runoff from the public road (S. Harp Blvd.) in front of the property owner’s house. The applicant stated that the water from the road is more than the drain on the property can handle and floods the front yard. The applicant stated that the flooding has come over the front porch and they have had to pump the water out to stop it from getting into the house.
This project is located at E. 81st St. S. (W. Houston St.) and S. 241st E. Ave. (Oneta Rd.) in the Cambridge Estates subdivision that was platted in 1978 and annexed into the City of Broken Arrow in 1985. The Cambridge Estates subdivision has little to no stormwater conveyance system. The streets are the main form of conveyance with a ditch down the middle of the road.
The drainage concern was presented to the Drainage Advisory Committee on April 28th, 2025 for expenditure of survey funds and approved at the May 20th, 2025 City Council Meeting.
Design was conducted in house. Plans have been finalized and are currently going through utility coordination and ROW. A storm sewer system has been designed to divert the stormwater away from the applicant’s house and into a designated drainageway that discharges at the back of the property.
Staff is requesting $60,000.00 of the 2018 GO Bond, Proposition 6 for construction funds.
Original Case No. 25-008
This area flows to Adams Creek.
Cost: $60,000.00
Funding Source: 2018 GO Bond, Proposition 6
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: Drainage Report, Exhibits
Recommendation:
recommend
Recommend to City Council the expenditure of construction funds to construct drainage improvements near 8624 S. Harp Boulevard in the Cambridge Estates Subdivision
end