LEGISLATIVE RESEARCH CENTER
File #: 16-1559    Name:
Type: Public Hearings Status: Agenda Ready
File created: 12/30/2016 In control: Planning Commission
On agenda: 1/12/2017 Final action:
Title: Public hearing, consideration, and possible action regarding PUD 256 and BAZ 1969, Whiskey Ridge, 142.16 acres, A-1 to RS-3/PUD 256, southeast corner of 23rd Street and Rockford Street
Attachments: 1. 2-CASE MAP.PUD-256 & BAZ-1969.pdf, 2. 3-AERIAL.PUD 256 & BAZ 1969.pdf, 3. 4-COMP PLAN.PUD 256 & BAZ 1969.pdf, 4. 5-PUD 256 DESIGN STATEMENT AND SITE PLAN.pdf
Related files: 17-1755

Broken Arrow Planning Commission

01-12-2017

 

To:                     Chairman and Commission Members

From:                     Development Services Department

Title: 

title

                     Public hearing, consideration, and possible action regarding PUD 256 and BAZ 1969, Whiskey Ridge, 142.16 acres, A-1 to RS-3/PUD 256, southeast corner of 23rd Street and Rockford Street

End

 

Background:

Applicant:                                          Alan Betchan, AAB Engineering, LLC

Owner:                     Wellington Investments

Developer:                                          Wellington Investments

Engineer:                                          AAB Engineering, LLC

Location:                     Southeast corner of 23rd Street and Rockford Street

Size of Tract                                          142.16 acres

Number of Lots:                     1

Present Zoning:                     A-1

Proposed Zoning:                     RS/3/PUD 256

Comp Plan:                                          Level 2 and Greenway/Floodplain

 

Planned Unit Development (PUD) 256 and BAZ 1969 involve 142.16 acres of undeveloped and unplatted property located on the southeast corner of 23rd Street and Rockford Street.  Up to 450 single family detached residential units are proposed in conjunction with this PUD and rezoning request.  The west part of the property is located within 100-year floodplain of Spunky Creek.  The 100-year floodplain will be left as open space.

 

The property will be developed in accordance with the Broken Arrow Zoning Ordinance and the use and development regulations of the RS-3 district except for the following modifications:

 

                     Front yard setback reduced from 25 feet to 20 feet.

                     Rear yard setback along Rockford Street reduced from 35 feet to 20 feet.

                     Minimum lot size reduced from 7,000 square feet to 6,000 square feet.

                     Straight streets in excess of 900 feet in length will be allowed.

 

SURROUNDING LAND USES/ZONING/COMPREHENSIVE PLAN

 

The surrounding properties contain the following uses, along with the following development guide and zoning designations:                     

Location

Development Guide

Zoning

Land Use

North

City of Tulsa

AG

Undeveloped

East

Level 2

Unincorporated Wagoner County

Renaissance Park addition and Green Country waste water treatment facility

South

Levels 2 and 4 and Greenway/ Floodplain

AR-1

Steeple Chase addition, 100-year floodplain of Spunky Creek, and undeveloped

West

City of Tulsa

AG

Undeveloped and 100-year floodplain of Spunky Creek

 

According to the FEMA maps, the west part of the property is located in a 100-year floodplain area of Spunky Creek. 

 

A preliminary plat, Whiskey Ridge, has been submitted in conjunction with PUD 256 and BAZ 1969.  Water to this development will be provided by Wagoner County Rural Water District 4.  Sanitary sewer service will be provided by Green Country Sewer.  A lift station will be required to be installed to serve the property.  The waste water treatment facility for Green Country is located next to the southeast corner of Whiskey Ridge.

 

The property is designated as Level 2 and Greenway/Floodplain in the Comprehensive Plan.  RS-3 zoning is considered to be in accordance with Comprehensive Plan in Level 2.  The 100-year floodplain of Spunky Creek will be left as open space, which is in accordance with the Comprehensive Plan.

 

Attachments:                                Case map
                                   Aerial photo
                                   Comprehensive Plan
                                   PUD 256 design statement and site plan

 

Recommendation:                      

Based on the Comprehensive Plan, the location of the property, and the surrounding land uses, Staff recommends that PUD 256 and BAZ 1969 be approved, subject to the property being platted.  The portion of the property that is located outside the 100-year floodplain shall be designated as RS-3, and the portion of the property that is located inside the 100-year floodplain shall be designated as FD.

 

Reviewed and approved by:                       Michael Skates

 

MWS:  BDM