Title: Consideration, discussion, and possible approval of and authorization to award the Lowest Responsible bid to Gober Construction LLC. and approve and authorize execution of a construction contract for the Old Town Houston Street Storm Water Improvements Fort Worth Street to South 9th Street (Project SW26010)
Attachments: 1. 20251024 - Old Town Houston St. Bid Tabulation.Executed - 2254401 SW26010, 2. 20251105 - Garver Award Recommendation Letter.Final - 2254401 SW26010
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow City Council

Meeting of: 11-17-2025

 

Title:

title

Consideration, discussion, and possible approval of and authorization to award the Lowest Responsible bid to Gober Construction LLC. and approve and authorize execution of a construction contract for the Old Town Houston Street Storm Water Improvements Fort Worth Street to South 9th Street (Project SW26010)

End

 

Background:

This  Project includes excavation, grading, creating a drainage channel, approximately 614 Linear Feet of 18” polypropylene drainage pipe, and culverts. Project also includes erosion control, removal and replacement of sidewalks and driveways, construction staking, and other utility construction activities. Project is to address erosion along the channel and improve stormwater flow along Houston St. This project is located along Houston Street from Fort Worth Street to South 9th Street in Broken Arrow, OK. Construction time for this contract will be One Hundred Fifty (150) Calendar days. This Project was advertised with the 12” Waterline and Bore Improvements in the same area (Project 2254401) to ensure proper coordination and efficiency with work for both projects.

This Project was advertised on October 2nd and 9th, 2025. An optional Pre-Bid Meeting was held virtually on October 16th, 2025. There were five (5) bids received on October 23rd, 2025. The lowest bid was Stronghand LLC. For a Bid of $440,703.01, however, after investigating with references they were found to not be a responsible bidder. City Staff recommends the lowest responsible bid as Gober Construction LLC. for a Bid of $565,940.00. The Engineer’s Estimate for the Bid is $686,285.00.

 

Cost:                                                                $565,940.00

Funding Source:                     Storm Water Capital Funds

Requested By:                      Charlie Bright, P.E., Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          Old Town Houston St. Waterline Bore and Storm Water Improvements Fort Worth St. to S. 9th St. Certified Bid Tabulation, Garver Letter of Recommendation of Award

 

Recommendation:

recommend

Award the lowest responsible bid to Gober Construction LLC. and approve and authorize execution of a construction contract for the Old Town Houston Street Storm Water Improvements Fort Worth Street to South 9th Street (Project SW26010)