Legislation Details

File #: 26-1770    Name:
Type: Consent Item Status: Agenda Ready
File created: 11/6/2026 In control: Broken Arrow Municipal Authority
On agenda: 11/16/2026 Final action:
Title: Approval of and authorization to execute an Agreement for Professional Engineering Services with Wallace Design Collective, PC for the Regional Metropolitan Utility Authority (RMUA) Haikey Creek Wastewater Treatment Plant (WWTP) Biosolids Improvements (BAMA Project no. HC21020, RMUA Project no. RMUA ES 2020-11)
Attachments: 1. 20261105-Agreement w Wallace-Special Inspection Services.Legal Signed-HC21020
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Municipal Authority

Meeting of: 11-16-2026

 

Title:

title

Approval of and authorization to execute an Agreement for Professional Engineering Services with Wallace Design Collective, PC for the Regional Metropolitan Utility Authority (RMUA) Haikey Creek Wastewater Treatment Plant (WWTP) Biosolids Improvements (BAMA Project no. HC21020, RMUA Project no. RMUA ES 2020-11)

End

 

Background:

RMUA and BAMA representatives selected Jacobs Engineering Group, Inc. (Jacobs) in 2022 to update the Hakey Creek Wastewater Treatment Plant (HCWWTP) Biosolids Master Plan and Facility Plan and design the chosen alternative. The design of the Biosolids Facility was completed in June 2026. This project is for the construction of aerated static pile for composting of biosolids. Currently the HCWWTP has to haul it’s unprocessed sludge to City of Tulsa’s Southside WWTP for processing. This project will allow for HCWWTP to process its own biosolids and operate independently. The City of Tulsa advertised the project for bids in June & July 2026 and bids were opened July 24th, 2026. Construction is anticipated to take 730 days, and this agreement is for Wallace Design Collective to perform Special Inspection Services for several of the new buildings at the HCWWTP as part of the Biosolids Facility project.

This agreement is for $95,000.00, the cost of which will be evenly split between the City of Tulsa and BAMA.

 

Cost:                                                                $47,500.00 (BAMA’s cost)

Funding Source:                     OWRB Loan

Requested By:                      Charlie Bright, PE, Engineering and Construction Director

Approved By:                      City Manager’s Office

Attachments:                                          20261105-Agreement w Wallace-Special Inspection Services.Legal Signed-HC21020

Recommendation:

recommend

Approve and authorize execution of an Agreement for Professional Engineering Services with Wallace Design Collective, PC. for the Regional Metropolitan Utility Authority (RMUA) Haikey Creek Wastewater Treatment Plant (WWTP) Biosolids Improvements (BAMA Project no. HC21020, RMUA Project no. RMUA ES 2020-11)

end