File #: 23-1154    Name:
Type: Consent Item Status: Agenda Ready
File created: 8/30/2023 In control: Broken Arrow City Council
On agenda: 9/5/2023 Final action:
Title: Approval of and authorization to execute Change Order No. 1 with Sherwood Construction Co, Inc., for Oklahoma Department of Transportation Project No. STP-172N(455)IG, (City of Broken Arrow Project No. ST0914 - 23rd Street Improvements from Houston Street to Kenosha Street)
Attachments: 1. 220207 Change Order #1 Contractor Signed, 2. 220207 Sewer Line Relocation Plans
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow City Council

Meeting of: 09-05-2023

 

Title:

title

Approval of and authorization to execute Change Order No. 1 with Sherwood Construction Co, Inc., for Oklahoma Department of Transportation Project No. STP-172N(455)IG, (City of Broken Arrow Project No. ST0914 - 23rd Street Improvements from Houston Street to Kenosha Street)

End

 

Background:

STP-172N(45)IG of City of Broken Arrows Project # ST0914 - 23rd Street Improvements from Houston Street to Kenosha Street project includes: pavement widening from 2-lanes to 5-lanes with curb and gutter, stormwater improvements, waterline improvements, sanitary sewer improvements, addition of both sidewalk and sidepath, new traffic signals at 23rd & Houston, and construction of a new bridge over SH51 (Broken Arrow Expressway).  Due to federal funding being utilized, the project was bid and awarded by the Oklahoma Department of Transportation (ODOT) with Sherwood Construction being awarded the job.  The project is currently under construction with the contractor being overseen by ODOT’s construction management consultant Benchmark.

During construction, several issues have arisen which require a change order to the executed as bid contract.

Change Order #1 addresses the following additions /deletions/changes to the contract:

                     During the start of the project and evaluation of the as bid sewer line relocations along 23rd Street specifically at the College St. intersection, it was discovered that the current plans conflicted with the designed sewer relocation plans that were made within a more recent Broken Arrow Municipal Authority project and required adjustments to as bid plans. The main changes with the issued plans attached to this RFA is modifying materials form HDPE to PVC, coating the manholes, adjusting elevations, changing to composite style manhole lids, and adding an allowance for unforeseen waterline changes. The contractor has submitted the attached change order costs to cover the deductions of the original line items costs and adding in the non-bid line items for execution.

 The total cost for Change Order # 1 amounts to $55,334.50

                     

The additional cost associated with these changes is as follows:

Previous Change Orders:                                          $0.00

This Change Order(s):                                                               $55,334.50

Total Cost of Change Orders:                                          $55,334.50

Original Contract Amount:                                          $14,375,310.67

Revised Contract Amount:                                          $14,430,645.17

Percent Change in Contract:                                          0.4%

Applicable to Comp. Bid Act:                     0.4%

 

Cost:                                                                $55,334.50

Funding Source:                     2014 General Obligation Bonds

Requested By:                      Ethan J.L. Edwards, PE - Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          STP-172N(455)IG (City of Broken Arrow project # ST0914 - Change Order #1, ST0914 Sewer Line Relocation Plans

 

Recommendation:

recommend

Approve and authorize execution of Change Order No. 1 with Sherwood Construction Co, Inc., for Oklahoma Department of Transportation Project No. STP-172N(455)IG, (City of Broken Arrow Project No. ST0914 - 23rd Street Improvements from Houston Street to Kenosha Street)