Skip to main content
LEGISLATIVE RESEARCH CENTER
File #: 25-1582    Name:
Type: General Business Status: Agenda Ready
File created: 11/6/2025 In control: Broken Arrow Municipal Authority
On agenda: 11/17/2025 Final action:
Title: Consideration, discussion, and possible approval of and authorization to execute Amendment 2 to Agreement for Professional Engineering Services with Black & Veatch Corporation and the Regional Metropolitan Utility Authority (RMUA) for Haikey Creek Lift Station Phase IV Improvements (Project No. HC23020, RMUA Project No. RMUA ES 2022-04)
Attachments: 1. 20251106-Amendment 2 for BAMA-HC23020
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Municipal Authority

Meeting of: 11-17-2025

 

Title:

title

Consideration, discussion, and possible approval of and authorization to execute Amendment 2 to Agreement for Professional Engineering Services with Black & Veatch Corporation and the Regional Metropolitan Utility Authority (RMUA) for Haikey Creek Lift Station Phase IV Improvements (Project No. HC23020, RMUA Project No. RMUA ES 2022-04)

End

 

Background:

This project will be for upgrading the existing Haikey Creek Lift Station from a firm capacity of approximately 22 Million Gallons per Day (MGD) to 42 MGD. Due to increased sewer flows to this area for both Broken Arrow and Tulsa the station is currently under capacity and in need of improvements. The project will include design for a new Supplemental Lift Station on the existing HCLS site to add 20 mgd firm pumping capacity and associated HVAC, piping, sitework to provide a fully functioning system with the existing facilities as well as associated hydrology and hydraulics (H&H) modeling necessary to meet anticipated permitting requirements.  In addition, the preliminary design will include raising existing outdoor electrical equipment within the berm to above the height of the berm as well as raising the access road to the HCLS above the 100-year flood elevation. This amendment will be for preliminary design up through approximately 65% design. A future amendment is anticipated for final design.

This amendment has been negotiated with Black and Veatch Corporation for a fee of $1,500,970.00 which will be split equally between BAMA and Tulsa. BAMA’s portion will be $750,485.00 for Amendment 2.

 

Cost:                                                                $750,485.00

Funding Source:                     OWRB Loan

Requested By:                      Charlie Bright, P.E., Director of Engineering & Construction

Approved By:                      City Manager’s Office

Attachments:                                          20251110-Amendment 2-HC23020

 

Recommendation:

recommend

Approve and authorize execution of Amendment 2 to Agreement for Professional Engineering Services with Black & Veatch Corporation and the Regional Metropolitan Utility Authority (RMUA) for Haikey Creek Lift Station Phase IV Improvements (Project No. HC23020, RMUA Project No. RMUA ES 2022-04)

end